105 record(s) found
| Agency | Contract (PO) # | Specification # | Award amount | Award date | Commodity or service | Department | |
|---|---|---|---|---|---|---|---|
| CITY | 124006 | $4,141,175.70 | 02/19/2015 | Oak Park Avenue Improvements | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 129262 | $2,247,098.69 | 08/31/2015 | Mobile Ave. Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 120967 | $5,085,334.25 | 03/23/2016 | 57th & 56th STREET RELIEF SEWER IMPROVEMENT PROJECT | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 188358 | $1,476,671.65 | 11/07/2016 | 77TH AND BLACKSTONE SEWER IMPROVEMENT PROJECT | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 875445 | $6,681,522.66 | 03/18/2020 | 875445: Arterial Street ADA Ramp Improvement Projects 56 & 60 - CENTRAL Area | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 293822 | $4,550,197.80 | 05/09/2018 | DWM Sewer Improvement Project Package P-2017-08 - Various Locations | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 79994 | $2,780,626.10 | 09/17/2010 | Arterial Street ADA Ramp Construction - North Area | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 233824 | $5,335,616.30 | 07/27/2018 | DWM Sewer Improvement Project Package P-2017-09 - Various Locations | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 119802 | $4,058,320.80 | 07/09/2014 | South Austin Ave. Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 18668A | $1,974,165.00 | 04/27/2006 | VERTICAL CLEARANCE IMPROVEMENTS - CERMAK RD. @ CAMPBELL AVE. B-0-227 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 34434 | $1,965,930.60 | 08/02/2006 | INDUSTRIAL STREET IMPROVEMENTS - W. 76TH ST., S. PULASKI RD. TO 1100 FT. WEST U-3-110 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 31924 | $1,307,788.67 | 04/27/2005 | NEW STREET CONSTRUCTION LITTLE VILLAGE HIGH SCHOOL INFRASTRUCTURE IMPROVEMENTS | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 86952 | $1,304,731.25 | 07/22/2011 | Vertical Clearance Improvements West 79t St. at Leavitt Street | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
P011533
|
PG55569801 | $1,023,570.50 | 01/04/1999 | NORTH SPRINGFIELD/WEST WILSON AVENUE SEWER | DEPARTMENT OF WATER MANAGEMENT | Details |
| CITY |
P010984
|
PU50229501 | $431,641.00 | 06/19/1995 | 1995 G.O. BOND SIDEWALK RECONSTRUCTION | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 934441 | $4,018,046.25 | 04/30/2020 | Beach and Midway Sewer Improvement | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY |
P011137A
|
PS50969601A | $1,752,606.77 | 04/24/1998 | TO ADVERTISE-STREETSCAPING WENTWORTH/CERMAK-25TH STREET | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 122903 | $2,650,762.50 | 12/10/2015 | 60TH STREET SEWER IMPROVEMENT PROJECT | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY |
P011321
|
PU70849701 | $689,550.00 | 08/06/1997 | TO ADVERTISE-1997 M.F.T. BOND SIDEWALK RECONSTRUCTION | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P011376
|
PU60429701 | $753,060.90 | 01/29/1998 | ADVERTISED RICE/IOWA/WALTON/ | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P011601
|
PB82369901 | $1,768,186.99 | 04/08/1999 | TO ADVERTISE: MEDIAN LANDSCAPE IMPROVEMENT PROJECT - | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P011004
|
PB30139501 | $3,869,318.75 | 10/18/1995 | TO ADVERTISE-LASALLE STREETSCRAPE PROJECT | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P010497A
|
PE14169201 | $0.01 | 10/11/2002 | PN84P010497A NORTH AVENUE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P010507
|
PU00359201 | $0.03 | 10/11/2002 | PN84P010507 NEW STREET C | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 15179 | $1,898,256.93 | 05/04/2006 | VERTICAL CLEARANCE IMPROVEMENTS / S. LOOMIS ST. -ELEANOR ST. TO ARCHER AVE. | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
P010980
|
PU50229501 | $653,436.80 | 06/19/1995 | 1995 G.O. BOND SIDEWALK PROGRAM AREA 1 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 97769 | $2,204,478.05 | 04/03/2012 | Industrial Street Improvement/Kinzie Street Improvements | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 75173 | $8,156,390.30 | 06/18/2010 | LASALLE DRIVE RECONFIGURATION | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
P011812
|
PG58090001 | $1,500,642.50 | 06/07/2000 | NORTH OAKLEY AVE. / W. BERWYN / W. WINONA ST. SEWER | DEPARTMENT OF WATER MANAGEMENT | Details |
| CITY |
P011574
|
PG57319801 | $515,551.90 | 03/22/1999 | W. DEVON AVE - N NATOMA AVE TO N MILAUKEE AVE | DEPARTMENT OF WATER MANAGEMENT | Details |
| CITY | 122495 | $2,512,173.25 | 06/11/2015 | 76th Street/Wentworth Ave. Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 15572 | $850,205.70 | 06/10/2004 | VERTICAL CLEARANCE IMPROVEMENT - 2200 WEST 43RD STREET B-1-429 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
P011199
|
PB60429601 | $1,077,503.00 | 04/14/1997 | TO ADVETISE HENRY HORNER HOMES. | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 22786 | $353,194.90 | 06/07/2005 | SOUTH OLD HARLEM AVENUE IMPROVEMENTS U-2-111 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
P011391
|
PG56979701 | $1,295,656.47 | 03/24/1998 | NORTH KOSTNER/WEST WILSON AVENUE SEWER | DEPARTMENT OF WATER MANAGEMENT | Details |
| CITY |
P010877A
|
PU40409401 | $31,508.10 | 04/25/1994 | 1994 G.O. BOND SIDEWALK RECONSTRUCTION - AREA 9 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P010878A
|
PU40409401 | $121,692.24 | 04/25/1994 | 1994 G.O. BOND SIDEWALK RECONSTRUCTION - AREA 9 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P011023
|
PB40129501 | $329,850.75 | 07/09/1996 | TO ADVERTISE-FOSTER AVENUE VIADUCT CLEARANCE IMPROVEMENT | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P011029
|
PB40119501 | $965,556.20 | 07/11/1996 | TO ADVERTISE-ELSTON AVENUE VIADUCT CLEARANCE IMPROVEMENT | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 108359 | $6,550,914.90 | 05/08/2013 | Milwaukee Avenue Section 3 Improvements | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 119805 | $3,056,581.00 | 06/26/2014 | Bryn Mawr Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 113332 | $1,015,388.10 | 04/22/2014 | LANGLEY ALLEY SEWER IMPROVEMENT | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 79980 | $3,799,337.50 | 06/11/2010 | Irving Park Streetscape Western Ave to Dame Ave CDOT#S-7-149 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
P011623G
|
PU91379901 | $811,075.00 | 06/17/1999 | TO ADVERTISE: 1999 M.F.T. BOND 50/50 SIDEWALK RECONSTRUCTION | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P011803
|
PB82050001 | $8,888,222.97 | 08/01/2000 | BIDSDVERTISE: IMPROVEMENT OF DAMEN AVE. | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P011288
|
PB20239701 | $2,577,692.85 | 07/13/1998 | TO ADVERTISE:CENTRAL AVENUE IMPROVEMENT | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P010953
|
PS50249501 | $919,570.82 | 05/17/1995 | 1995 MODEL BLOCK PROGRAM | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P010846
|
PS30309401 | $425,900.75 | 07/15/1994 | STREETSCRAPING-SHERIDAN/LELAND-FOSTER | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P010966
|
PS30319501 | $545,919.16 | 09/12/1996 | UPGRADE BUSINESS AREA-WESTERN/CONGRESS-ROOSEVELT | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P011176
|
PB30209601 | $2,630,195.90 | 08/07/1997 | TO ADVERTISE-WEST 51ST. STREET IMPROVEMENT | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 42723 | Up To $6,065,425.00 | 04/11/2006 | RESIDENTIAL CONCRETE - AREA 3 | Details | ||
| CITY | 119083 | $4,324,317.45 | 01/27/2016 | FULLERTON AVENUE STREETSCAPE IMPROVEMENT: ASHLAND AVENUE TO RACINE AVENUE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 225445 | $3,868,987.05 | 06/20/2017 | NEW STREET CONSTRUCTION - S. GREEN BAY AVENUE, E. 84TH STREET & E. 85TH STREET | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 126748 | $995,864.80 | 11/03/2015 | 23rd STREET STREETSCAPE - STATE STREET TO INDIANA AVENUE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 119810 | $1,076,648.00 | 06/07/2014 | DIVERSEY PARKWAY SEWER IMPROVEMENT | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 97366 | Up To $32,825.00 | 05/10/2011 | Memorandum of Understanding for the rental of hired operations in relation to severe weather | DEPARTMENT OF STREETS AND SANITATION | Details | |
| CITY |
P011434
|
PB70519801 | $755,539.75 | 05/05/1998 | VIADUCT CLEARANCE INPROVEMENT GRAND AVE TO LAMON AVE. | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P011102B
|
PG55539601 | $2,387,755.50 | 07/03/1996 | BELMONT HEIGHTS SYSTEM - CONTRACT NO. 2 | DEPARTMENT OF WATER MANAGEMENT | Details |
| CITY |
P011765
|
PU91350001 | $872,661.50 | 08/28/2001 | SOUTH GROVE STREET IMPROVEMENTS | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P011949B
|
PG58540101 | $1,471,689.70 | 08/29/2001 | NORTH SPAULDING AVENUE/WEST HOLLYWOOD AVENUE SEWER | DEPARTMENT OF WATER MANAGEMENT | Details |
| CITY |
P011243
|
PG56019601 | $523,797.50 | 02/25/1997 | WEST HURON STREET/NORTH ELIZABETH STREET SEWERS | DEPARTMENT OF WATER MANAGEMENT | Details |
| CITY |
P011152A
|
PU60289601 | $335,691.50 | 09/18/1996 | 1996 G. O. BOND SIDEWALK RECONSTRUCTION-ASSIGNMENT | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P011102
|
PG55539601 | $2,387,755.50 | 07/03/1996 | BELMONT HEIGHTS SYSTEM - CONTRACT NO. 2 | DEPARTMENT OF WATER MANAGEMENT | Details |
| CITY |
P010846A
|
PS30309401 | $125,202.79 | 07/15/1994 | STREETSCAPING - SHERIDAN/LELAND-FOSTER | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P011221
|
PB60199601 | $648,810.75 | 12/09/1996 | TO ADVERTISE HOMAN SQUARE INFRASTRUCTURE IMPROVEMENTS | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 106367 | $12,684,900.40 | 08/08/2012 | W. Peterson Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 54756 | $3,272,129.30 | 05/01/2007 | DESPLAINES CORRIDOR - PART II MAXWELL STREET MARKET STREETSCAPE S-5-142 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 57703 | $8,118,068.25 | 11/13/2007 | WELLS STREET IMPROVEMENT PROJECT B-6-140A | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
P011894
|
PB82040001 | $4,007,894.93 | 07/05/2001 | ARMITAGE AVENUE(CICERO AVENUE TO CENTRAL PARK) | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 101361 | $1,055,706.50 | 03/15/2013 | INDUSTRIAL STREET IMPROVEMENTS - N. KOLMAR AVE. | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 125185 | $1,940,442.00 | 04/28/2016 | 105th Street Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 120969 | $3,729,119.45 | 08/31/2015 | 62nd STREET SEWER IMPROVEMENT | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY |
P011323
|
PU70849701 | $698,275.00 | 08/06/1997 | TO ADVERTISE-1997 M.F.T. BOND SIDEWALK RECONSTRUCTION | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P011639
|
PU81399901 | $2,693,813.60 | 09/07/1999 | NEW STREET CONSTRUCTION | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P011589
|
PB70909901 | $965,176.62 | 09/16/1999 | TO ADVERTISE:UNION AVE. VIADUCT:41ST ST.-PERSHING RD. | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 23599 | $4,026,369.20 | 06/13/2005 | CHICAGO AVENUE IMPROVEMENTS - GRAND AVE. TO MILWAUKEE AVE. B-3-376 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
P010664B
|
PC92009301 | $482,781.36 | 06/15/1993 | 1993 RESIDENTIAL CURB & GUTTER CONSTRUCTION | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P011226
|
PU60399601 | $1,409,418.60 | 04/03/1997 | TO ADVERTISE FOR BIDS -W. DICKENS AVENUE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
P010766
|
PU10479301 | $978,151.30 | 06/30/1995 | NEW STREET CONSTRUCTION 6975 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 119836 | $1,094,295.40 | 05/23/2014 | ALBANY AVENUE SEWER IMPROVEMENT | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY |
P010930
|
PB30329401 | $652,616.95 | 01/17/1995 | FURNISHING ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED FOR: | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 58904 | Up To $10,000,000.00 | 12/07/2007 | CDOT-JOC REPAIR, RECONSTRUCTION AND REHABILITATION OF FLAT WORK/SITE WORK AND STRUCTURES | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
P011665
|
PB82269901 | $1,494,380.04 | 09/07/1999 | TO ADVERTISE:FOSTER AT 4600 WEST VIADUCT CLEARANCE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | PB14190101 | $5,217,593.20 | 08/09/2002 | HALSTED STREET-IMPROVEMENT-MAXWELL STREET TO I-290 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
P011874
|
PB82270001 | $11,015,300.85 | 11/20/2000 | ROOSEVELT ROAD IMPROVEMENTS-OGDEN AVENUE TO ASHLAND AVENUE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 744438 | $1,855,730.00 | 06/13/2019 | Avers and Hamlin Sewer Improvement | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 565697 | Up To $2,072,984.00 | 09/24/2018 | COMMUNITY INFRASTRUCTURE CONTRACT (CIC) - AREA 7 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
P011018
|
PF56069503 | $1,335,993.10 | 08/02/1995 | STREET RESTORATION FOR WATER MAIN INSTALLATION PROJECTS | DEPARTMENT OF WATER MANAGEMENT | Details |
| CITY | 57443 | $1,239,383.02 | 11/13/2007 | WPA / NEW STREET CONSTRUCTION NORTH AREA - PROJECT 5 U-4-208 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
P010764
|
PU10459301 | $820,078.00 | 06/02/1997 | TO ADVERTISE-NEW STREET CONSTRUCTION | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 113327A | $1,917,810.00 | 04/27/2015 | 57th STREET SEWER IMPROVEMENT PROJECT | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 79282 | Up To $6,202,865.00 | 06/17/2010 | ADA Ramp Program - 2010 North Area | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
P011496
|
PB82169801 | $1,083,563.65 | 08/17/1998 | TO ADVERTISE: PETERSON AVENUE/MEDIAN LANDSCAPE IMPROVEMENTS | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | PS91340201 | $1,416,682.65 | 08/12/2002 | GRAND AVENUE STREETSCAPE - HARLEM AVENUE TO SAYRE STREET | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 306235A | $13,393,473.22 | 08/02/2018 | DWM Sewer Improvement Project Package P-2017-05 ¿ Various Locations | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY |
P011394
|
PG55609701 | $687,897.95 | 03/16/1998 | MISCELLANEOUS SEWER SYSTEM NO. 94-2 | DEPARTMENT OF WATER MANAGEMENT | Details |
| CITY |
P011153A
|
PU60289601 | $477,565.90 | 09/18/1996 | 1996 G. O. BOND SIDEWALK RECONSTRUCTION-ASSIGNMENT | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 934457 | $2,766,562.45 | 03/05/2021 | 934557: NORTHWEST HIGHWAY SEWER IMPROVEMENT PROJECT | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 1217522 | Up To $44,000,000.00 | 09/27/2021 | 1217522: Neighborhood Capital Improvement Contract (NCI) - Southeast Area | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 1085406 | $2,615,273.15 | 03/02/2021 | West Rogers Park Sewer Improvement | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 469935 | DUR | 03/02/2021 | RFQ/MTA for Emergency Bridge and Viaduct Repair Program | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 934470 | $4,676,920.90 | 03/19/2021 | Garfield Ridge Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 1190210A | Up To $8,801,121.00 | 01/08/2021 | 1190210A: Community Infrastructure Contract (CIC) - Area 3 - MBI-1/ Bidding Restricted to Mid-Sized Local Business Enterprises | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 1201397 | $6,050,212.65 | 05/19/2023 | 1201397: Cermak Road Vertical Clearance Improvement | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 1267955 | $9,914,072.75 | 06/11/2025 | 1267955: Parnell Avenue: North of Pershing Road Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details |