98 record(s) found
Agency | Contract (PO) # | Specification # | Award amount | Award date | Commodity or service | Department | |
---|---|---|---|---|---|---|---|
CITY | 129308 | Up To $4,690,400.00 | 03/17/2015 | Private Drain Repair Program - North Areas | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 129308 | Up To $4,583,900.00 | 03/17/2015 | Private Drain Repair Program - South Areas | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 127998 | $3,750,171.00 | 04/27/2016 | Merrionette Manor Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 5621 | $878,562.00 | 06/03/2003 | SEWER IMPROVEMENT PROGRAM - N. RICHMOND ST. / W. GRANVILLE AVE. SEWERS | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 4416 | $525,495.00 | 05/09/2003 | SEWER IMPROVEMENT PROGRAM - WEST 32ND STREET SEWER | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 105330 | $3,341,688.95 | 06/07/2012 | HOWARD STREET STREETSCAPE - PAULINA AVENUE TO SHERIDAN ROAD | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 116857 | $3,709,259.00 | 10/25/2013 | 71st STREET STREETSCAPE (PHASE 1) | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 86952A | $1,733,774.00 | 07/30/2014 | VERTICAL CLEARANCE IMPROVEMENT - WEST 79TH St. at SOUTH LEAVITT St. | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 64688 | $1,209,715.00 | 06/20/2008 | Bird Deterrent Wire - North Airfield | OHARE MODERNIZATION PROJECT | Details | |
CITY | 64007 | $1,748,468.90 | 10/20/2008 | BRYN MAWR AVENUE STREETSCAPE - BERNARD STREET TO KEDZIE AVENUE/ JERSEY AVENUE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 79984 | $2,726,834.60 | 08/19/2010 | HALSTED STREET STREETSCAPE - 41ST STREET TO 36TH STREET | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 64887 | $3,974,983.06 | 12/03/2009 | MORSE AVENUE STREETSCAPE - MORSE AVENUE FROM CLARK STREET TO SHERIDAN ROAD AND GLENWOOD AVENUE FROM LUNT AVENUE TO FARWELL AVENUE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 292687 | $4,492,469.00 | 07/27/2018 | DWM Sewer Improvement Project Package P-2017-06 ¿ Various Locations | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 366701 | $2,749,800.00 | 05/09/2018 | DWM Sewer Improvement ¿ North Leamington | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 24500 | $965,059.50 | 11/09/2004 | KEDZIE AVENUE STREETSCAPE - 80TH STREET TO 83RD STREET S-O-124 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 35153 | $214,683.00 | 02/01/2006 | FULLERTON AVENU UNDERBRIDGE CONNECTOR AT FULLERTON AVENUE BRIDGE OVER THE NORTH BRANCH OF THE CHICAGO RIVER | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 7428 | $297,500.00 | 05/22/2003 | Fuel farm Sewer Lift Station Replacement - O'Hare PH60710201, Target Market | DEPT OF AVIATION | Details | |
CITY | PU01510101 | $495,582.00 | 12/06/2002 | West Rice Street Improvements | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 111535 | $2,734,268.00 | 04/02/2013 | 90th Street Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 96523 | $3,173,256.90 | 12/22/2011 | IRVING PARK ROAD STREETSCAPE - IRVING PARK ROAD FROM THE CHICAGO RIVER TO WESTERN AVENUE AND LINCOLN AVENUE/ DAMEN AVENUE TO RAVENSWOOD | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 934466 | $4,134,217.00 | 04/30/2020 | Higgins Sewer Improvement DWM PN7289 | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 138104 | Up To $15,038,540.00 | 07/13/2016 | Ancillary Sewer Construction - South | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 129733 | Up To $9,561,367.00 | 06/01/2015 | Ancillary Sewer Construction - Central Area | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 121520 | $2,915,834.50 | 06/10/2015 | Central Ave. Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 726006 | $2,887,587.00 | 07/17/2019 | Lamon and Laramie Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 306257 | $8,499,440.00 | 06/19/2017 | P-2017-10 Sewer Improvements Various Locations | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | PS91450201 | $1,185,969.00 | 08/06/2002 | LINCOLN SQUARE/GIDDINGS PLAZA STREETSCAPE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 43034 | $1,873,022.35 | 05/17/2006 | OMP-AMERICAN AIRLINES REPLACEMENT PARKING LOT | OHARE MODERNIZATION PROJECT | Details | |
CITY | 111649 | $2,841,854.00 | 06/11/2013 | Woodlawn Sewer Improvement | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY |
P011516
|
PH50069802A | $196,950.00 | 08/11/2000 | TRANSPORTATION CENTER ROADWAY REHAB - O'HARE | DEPT OF AVIATION | Details |
CITY | 27396 | $4,494,108.40 | 01/28/2008 | INDUSTRIAL STREET IMPROVEMENTS / S. RACINE AVE. - W. PERSHING ROAD TO W. 35TH ST. & W. 37TH ST. - S. RACINE AVE. TO S. MORGAN ST. | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 57874 | $930,999.70 | 05/12/2008 | LANDSCAPE MEDIAN IMPROVEMENT PROJECT/ STATE STREET - 30TH STREET TO 25TH STREET | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 68904 | Up To $6,074,250.00 | 03/19/2009 | PRIVATE DRAIN REPAIR - SOUTH AREA/ DWM PROJECT 6220B | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 59425 | $394,857.75 | 03/17/2008 | CONRAIL BIKEWAY - 94TH STREET TO 95TH STREET | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 332055 | $2,481,300.75 | 08/29/2018 | BESSIE COLEMAN WATERMAIN REPLACEMENT (SPEC 332055) | DEPT OF AVIATION | Details | |
CITY | 119804 | $4,695,740.80 | 06/30/2014 | Bridgeport Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 119840A | $5,111,798.00 | 04/22/2015 | 125th Street Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 48282 | $1,088,095.00 | 08/07/2007 | 33RD WARD YARD RIVER BANK STABILIZATION | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 19089 | $1,888,888.88 | 12/08/2004 | INDUSTRIAL STREET IMPROVEMENTS - W. 48TH STREET | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 115736 | $4,792,907.50 | 06/07/2014 | VERTICAL CLEARANCE IMPROVEMENT 4900 S. KEDZIE AVENUE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 65134 | $8,272,489.90 | 06/21/2010 | ROADWAY RECONSTRUCTION CERMAK ROAD/ BLUE ISLAND AVENUE WOLCOTT AVENUE TO HALSTED STREET AND WESTERN AVENUE PLAZA | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 63832 | $489,720.50 | 10/21/2008 | 18TH STREET UNDERBRIDGE CONNECTOR - 18TH STREET & THE SOUTH BRANCH OF THE CHICAGO RIVER | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 111602 | $2,368,545.30 | 06/11/2013 | Paxton Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 100949 | $1,617,552.75 | 03/28/2013 | Priority Area Vaulted Sidewalk Program - 2011 Michigan Ave. Corridor | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 119806 | $4,701,958.00 | 05/20/2014 | S. Hoyne Avenue Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 100052 | Up To $5,027,400.00 | 03/08/2012 | Private Drain Repair - North Area | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 567037 | $10,932,728.00 | 06/13/2019 | Forest Preserve Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 306251 | $6,939,702.15 | 05/21/2018 | DWM Sewer Improvement Project Package P-2017-07 ¿ Various Locations | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 744442 | $4,874,672.50 | 06/26/2019 | 71st and Stony Island Sewer Improvement | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 12277 | $1,487,005.10 | 11/18/2003 | 79TH STREET STREETSCAPE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 79285 | Up To $6,363,255.00 | 06/01/2010 | ADA Ramp Program - 2010 Far South Area | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 5574 | $1,844,967.50 | 06/04/2003 | North Bell/West School/West Roscoe/North Leavitt Street Sewers | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 102616 | $1,406,000.00 | 05/08/2012 | DSS OPERATIONS CAMPUS SITE DEVELOPMENT | DEPT OF GENERAL SERVICES | Details | |
CITY |
P011694
|
PE90229901A | $249,940.00 | 03/23/2000 | NORTH SHORE CHANNEL-BRYN MAWR UNDERBRIDGE CONNECTION | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
CITY | 23597 | $1,810,496.85 | 01/27/2005 | NEW STREET CONSTRUCTION PROJECT 'A' | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 76607 | $3,570,704.20 | 06/08/2010 | Industrial Street Improvements: Fleet Management Area | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 76483 | $1,251,373.00 | 07/30/2010 | Vertical Clearance Improvement: 1010 California | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 129732 | $2,096,531.25 | 12/23/2016 | 128th STREET SEWER IMPROVEMENT | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 101843 | $1,452,081.50 | 03/21/2013 | INDUSTRIAL STREET IMPROVEMENTS N. BESLEY CT./ W. WABANSIA AVE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 112944 | $3,447,566.10 | 07/30/2013 | ROOSEVELT ROAD STREETSCAPE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 138101 | Up To $15,707,538.00 | 07/15/2016 | Ancillary Sewer Construction - Central | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | PU11080201 | $667,525.00 | 04/11/2003 | South Lawndale Improvements- W. 33rd st. to W. 35th st. | Details | ||
CITY | 105292 | $2,887,786.75 | 06/27/2012 | 114th Street Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 100052 | Up To $4,864,400.00 | 03/08/2012 | Private Drain Repair - South Area | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 61306 | $3,190,321.12 | 11/17/2009 | US-41 RELOCATION - ADVANCE CONTRACT #2: 83RD STREET FROM HOUSTON TO GREEN BAY/ GREEN BAY FROM 83RD STREET TO 86TH STREET | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY |
P012008
|
P993040101 | $3,080,310.00 | 10/04/2001 | JARDINE WATER PURIFICATION PLANT LANDSCAPE PHASE # 1 | DEPARTMENT OF WATER MANAGEMENT | Details |
CITY |
P011947
|
PG58500101 | $1,458,542.50 | 07/27/2001 | CALIFORNIA AVENUE SYSTEM, CONTRACT NO. 8\ | DEPARTMENT OF WATER MANAGEMENT | Details |
CITY | PG59080201 | $685,400.00 | 05/21/2002 | S.HOMAN AVE./W.80TH ST./S. ST. LOUIS AVE* | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 18537 | $1,952,084.75 | 06/24/2004 | NEW STREET CONSTRUCTION PROJECT 'K' | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | PG58030001 | $397,817.00 | 12/30/2002 | PN89P011808 ASSIGNED FROM #P011808 W. SCHUBERT AVENUE / N. MULLIGAN AVENUE SEWER | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 63406 | $3,799,769.74 | 07/28/2008 | WPA/NEW STREET CONSTRUCTION - SOUTH AREA, Project 5 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 34429 | $2,681,987.50 | 02/14/2007 | PULLMAN MARKET SQUARE IMPROVEMENTS U-2-127 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 119808 | $3,507,078.50 | 12/26/2014 | 47TH STREET SEWER IMPROVEMENT PROJECT | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 71847 | $947,800.00 | 08/06/2009 | Arrestor Extension Runway 4R Departure - ORD, H6159.07-01, Spec# 71847, RX# 41706 | DEPT OF AVIATION | Details | |
CITY | PU01430101 | $425,162.00 | 04/05/2002 | 51ST STREET IMPROVEMENT (ST. LOUIS TO GTW RR) | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY |
P011892
|
PS91550001 | $1,094,520.70 | 01/12/2001 | WELLS ST./ DIVISION TO NORTH AVE STREETSCAPE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
CITY | 726012 | $1,904,435.00 | 06/13/2019 | Gunnison and Argyle Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 13932 | $1,916,207.00 | 03/17/2004 | WEST GRAND AVENUE - FULLERTON AVE. TO NARRAGANSETT AVE B-3-329 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 1014258 | Up To $10,163,443.00 | 02/14/2020 | 1014258: Ancillary Sewer Construction - Central Area / DWM Project Number 7495B | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 119839 | $1,840,544.75 | 02/26/2015 | S. DREXEL AVENUE SEWER IMPROVEMENT | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 1190383 | $1,427,303.00 | 03/25/2022 | 1190383: West Woodlawn Sewer Improvement Project | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 1201443 | $5,809,821.00 | 03/25/2022 | 1201443: 58TH ST., PARNELL AND 44TH PL SEWER IMPROVEMENT PROJECT NO. 7500 & 7445 | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 1182986 | $9,590,136.25 | 06/25/2021 | 1182986: GRAND AVENUE IMPROVEMENTS - SECTION VI (W. Grand Ave. from W. Chicago Ave. to N. Damen Ave.) | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 1192197 | Up To $11,395,095.00 | 11/13/2020 | 1192197: Sewer Structure Rehabilitation North Area - North Avenue to Northern City Limits/ 7531 A | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 934475 | $1,437,669.00 | 03/15/2021 | 934475: 84th STREET MWRD CONNECTION SEWER IMPROVEMENT PROJECT | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 1190381 | $6,591,669.00 | 04/01/2022 | 1190381: Parnell Av and Halsted St Sewer Improvement Project (E-Procurement) | Details | ||
CITY | 1202616 | $8,475,611.50 | 08/31/2022 | 1202616: Lawrence Avenue Streetscape: Chicago River to Western Avenue | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 1202521 | Up To $2,066,800.00 | 02/19/2021 | DRAINS IN THE CITY RIGHT OF WAY REPAIR - AREA 2 NORTH CENTRAL | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY |
209547
|
1243247 | $6,492,172.15 | 01/24/2023 | 1243247: ISW BOTY CORRIDOR IMPROVEMENTS: ASHLAND AVE, 43RD ST TO 49TH ST (SBI) | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
CITY | 1190212A | Up To $8,357,935.00 | 02/24/2021 | 1190212A: Community Infrastructure Contract (CIC) - Area 5 - MBI-1/ Bidding Restricted to Mid-Sized Local Business Enterprises | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 1202522 | Up To $2,606,950.00 | 02/24/2021 | DRAINS IN THE CITY RIGHT OF WAY REPAIR - AREA 3 SOUTH CENTRAL | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY |
232085
|
1249099 | Up To $41,232,520.85 | 10/24/2023 | 1249099: Term Agreement for Lead Service Line Replacements - District 4 (Group B) | DEPARTMENT OF WATER MANAGEMENT | Details |
CITY | 1237531 | $8,998,333.31 | 05/12/2023 | 1237531: CLARK STREET STREETSCAPE: DEVON AVENUE TO ARTHUR AVENUE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY |
232080
|
1249097 | Up To $42,322,160.43 | 07/14/2023 | 1249097: Term Agreement for Lead Service Line Replacements - District 2 Group B | DEPARTMENT OF WATER MANAGEMENT | Details |
CITY | 1249096 | Up To $41,232,520.85 | 07/14/2023 | 1249096: Term Agreement for Lead Service Line Replacements - District 1 (Group B) | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 1249101 | Up To $48,595,084.68 | 10/27/2023 | 1249101: Term Agreement for Lead Service Line Replacements - District 6 | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 1249100 | Up To $48,595,084.68 | 10/27/2023 | 1249100: Term Agreement for Lead Service Line Replacements - District 5 | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 1249102 | Up To $2,896,084.63 | 10/31/2023 | 1249102: Term Agreement for Lead Service Line Replacements - District 7 | DEPARTMENT OF WATER MANAGEMENT | Details |