City of Chicago

Procurement Services

We are the contracting authority for the procurement of goods and services for the City of Chicago

contract.detail.title

Contract Details

   View payment details

Original Contract

DUR in the Award Amount column means that the contract award total Depends Upon Requirements. A Depends Upon Requirements contract is an indefinite quantities contract in which the city places orders as needed. The vendor is not guaranteed any particular contract award amount.
Contract (PO) # Disclosure # Award Date Start Date End Date Original Award Amount
01/10/2011 $101,800,753.95

Modifications/Amendments

Modification # Description Disclosure # Award Date Start Date End Date Amount
239541
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 09/26/2011 ($20,160.00)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 08/18/2015 $75,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 08/19/2015 $214,080.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 08/25/2015 $45,000.00
23954103
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 09/29/2015 ($1,131,647.03)
23954104
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 10/01/2015 ($386,584.00)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 11/19/2015 ($38,577.19)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 11/24/2015 ($18,194.37)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 03/08/2016 $232,000.00
23954108
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 04/26/2016 $1,685,750.96
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/12/2016 $58,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/29/2012 $5,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/17/2016 $195,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/18/2016 $27,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 09/28/2016 $1,043.09
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 10/04/2016 $135,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 10/13/2016 $16,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 10/31/2016 ($214,080.00)
23954117
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 11/02/2016 ($510,658.59)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/02/2012 $100,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 12/12/2016 ($16,300.81)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 01/12/2017 ($23,596.03)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 01/23/2017 $141,371.88
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 01/26/2017 $15,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 02/01/2017 $23,343.66
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 02/03/2017 $59,544.70
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 02/06/2017 $59,006.11
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 02/07/2017 $43,106.30
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 02/10/2017 $21,088.79
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 02/14/2017 ($43,005.54)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/03/2012 $35,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 02/21/2017 $22,897.72
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 02/23/2017 $20,959.37
23954132
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 02/24/2017 ($227,133.18)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 02/27/2017 $102,195.48
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 02/28/2017 $19,225.52
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 03/01/2017 $87,318.13
23954137
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 03/02/2017 $29,895.10
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 04/12/2017 $380,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/06/2012 $70,000.00
23954140
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/02/2017 ($145,945.40)
23954141
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/06/2017 $160,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 08/03/2017 ($7,384.86)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 08/11/2017 $680,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 08/14/2017 $330,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 08/15/2017 $2,252,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 08/16/2017 $400,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 09/18/2017 ($82,627.38)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 09/21/2017 ($29,318.83)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 09/28/2017 ($22,342.60)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/09/2012 $17,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 10/17/2017 ($8,137.77)
23954154
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 12/14/2017 ($154,156.63)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 01/03/2018 $306,759.22
23954156
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 01/05/2018 $103,978.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 04/05/2018 ($7,562.48)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 01/04/2019 $327,723.11
23954159
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/25/2019 ($38,486.87)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/11/2012 $13,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/02/2019 $50,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/24/2019 ($30,366.52)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/29/2019 $39,022.68
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 08/20/2019 $53,195.25
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 12/11/2019 $125,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 01/10/2020 $349,555.86
23954166
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/19/2023 $0.00
23954167
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/21/2023 $723,982.16
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 11/30/2023 ($9,109.97)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/12/2012 $20,000.00
2395418
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 09/25/2012 $267,879.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 09/27/2012 $80,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 01/04/2012 $31,185.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 10/02/2012 $15,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 10/04/2012 $22,362.13
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 10/05/2012 $902,212.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 10/10/2012 $16,506.36
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 10/11/2012 $76,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 10/15/2012 $6,100.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 10/23/2012 $35,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 10/25/2012 $15,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 10/29/2012 $80,000.00
2395429
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 11/14/2012 ($14,724.75)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 01/12/2012 $200,000.00
2395430
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 12/21/2012 $10,500.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 03/06/2013 $4,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 03/27/2013 ($73.24)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/08/2013 $63,055.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/09/2013 $123,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/10/2013 $50,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/13/2013 $35,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/14/2013 $20,640.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/16/2013 $89,585.81
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/17/2013 $15,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 01/17/2012 $15,500.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/20/2013 $22,238.08
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/22/2013 $519.28
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/23/2013 $50,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/04/2013 $2,500.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/05/2013 $35,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/05/2013 $10,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/06/2013 $6,600.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/11/2013 $3,324.42
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/12/2013 $2,842.85
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/17/2013 $11,400.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 01/17/2012 $75,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/18/2013 ($1,597.83)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/19/2013 $350.67
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/20/2013 $6,738.91
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/21/2013 ($4,670.37)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 08/21/2013 $11,808.56
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 09/04/2013 $229,610.27
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 09/05/2013 $50,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 09/06/2013 $20,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 09/11/2013 $25,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 09/12/2013 $89,200.06
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 01/17/2012 $18,100.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 09/17/2013 $87,163.34
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 11/01/2013 $50,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 11/04/2013 $50,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 11/05/2013 $29,742.70
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 11/06/2013 $25,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 11/18/2013 $30,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 11/20/2013 $9,921.58
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 11/21/2013 $40,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 12/16/2013 $1,999.36
2395469
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 03/10/2014 ($29,070.25)
239547
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 02/28/2012 ($27,893.75)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 03/12/2014 ($863.59)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 03/19/2014 ($18,252.29)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/10/2014 $4,486.30
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 08/18/2014 $35,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 03/26/2015 $1,349,075.06
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 04/03/2015 $20,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 04/06/2015 $25,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 04/03/2012 $10,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 04/07/2015 $49,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/11/2015 $5,051.19
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/14/2015 $7,500.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 05/26/2015 $10,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/01/2015 $310,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/05/2015 ($13,016.61)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 06/08/2015 ($4,030.91)
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/13/2015 $71,492.75
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/14/2015 $142,610.63
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 04/04/2012 $6,921.80
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/15/2015 $70,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/16/2015 $218,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/17/2015 $20.11
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/20/2015 $16,000.00
2395494
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/21/2015 $986,120.60
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/22/2015 $38,048.03
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 07/27/2015 $17,097.22
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 08/04/2015 $70,500.10
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 08/10/2015 $80,000.00
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract 08/12/2015 $75,000.00