City of Chicago

Procurement Services

We are the contracting authority for the procurement of goods and services for the City of Chicago

Contracts for Vendor

Contracts for JOHNSON CONTROLS FIRE PROTECTION LP

In order to view the Contract and Award Listings, you need to download Acrobat Reader.

Click on a column title to sort the records. For information and supporting documents concerning amendments, modifications and/or extensions to a contract, click the "Details" link in the search results.

DUR in the Award Amount column means that the contract award total Depends Upon Requirements. A Depends Upon Requirements contract is an indefinite quantities contract in which the city places orders as needed. The vendor is not guaranteed any particular contract award amount.

5 record(s) found

Agency Contract (PO) # Specification # Award amount Award date Commodity or service Department
CTA
B15OP01575
B15OP01575 $600,000.00 06/23/2016 INSPECTION, MAINTENANCE, TESTING, RECHARGING AND REPAIRING OF CARBON DIOXIDE & DRY CHEMICAL FIRE EXTINGUISHERS & ACCESSORIES SYSTEM-WIDE AS REQUIRED FOR A PERIOD OF UP TO THIRTY-SIX (36) MONTHS FROM DATE OF CONTRACT EXECUTION. SAFETY Details
CTA
B12OP00306A
B12OP00306A $14,040.00 03/07/2013 FURNISH VARIOUS SIZES OF NEW CHEMICAL AND WATER FIRE EXTINGUISHERS AS REQUIRED FOR A PERIOD OF UP TO 36 MONTHS FROM DATE OF CONTRACT EXECUTION. FACIL MAINT Details
CTA
B20OP03340
B20OP03340 $2,160,000.00 06/01/2021 FURNISH ALL LABOR AND EQUIPMENT REQUIRED TO TEST, INSPECT, REPAIR & MAINTAIN CTA?S WATER-BASED FIRE PREVENTION SYSTEMS AT VARIOUS LOCATIONS SYSTEM-WIDE FACIL MAINT Details
CTA
B20OP01575
B20OP01575 $40,000.00 08/14/2020 To test, repair, recharge, hydrostatic test and perform annual inspection of fire extinguishers for a period of twelve (12) months from August 14, 2020 thru August 13, 2021. SAFETY Details
CTA
C26OP0103315708E
C26OP0103315708E $238,333.85 04/09/2026 FURNISH ALL LABOR AND EQUIPMENT REQUIRED TO REPAIR AND RESTORE WATER-BASED FIRE PREVENTION SYSTEM AT SKOKIE HEAVY RAIL MAINTENANCE FACILITY INFRASTRUCTURE Details