In order to view the Contract and Award Listings, you need to download Acrobat Reader.
Click on a column title to sort the records. For information and supporting documents concerning amendments, modifications and/or extensions to a contract, click the "Details" link in the search results.
DUR in the Award Amount column means that the contract award total Depends Upon Requirements. A Depends Upon Requirements contract is an indefinite quantities contract in which the city places orders as needed. The vendor is not guaranteed any particular contract award amount.
16 record(s) found
| Agency | Contract (PO) # | Specification # | Award amount | Award date | Commodity or service | Department | |
|---|---|---|---|---|---|---|---|
| CITY |
26987
|
52064 | DUR | 10/17/2012 | TASK ORDER PROFESSIONAL DESIGN ENGINEERING SERVICES STREETSCAPE, RIVERWALK AND URBAN DESIGN | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
26986
|
56460 | Up To $2,518,404.34 | 10/17/2012 | Task Order Design Engineering Services (Project Categories 1-7) Roadway Design, Traffic Studies and Traffic Facilities Design Services | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 118890 | DUR | 02/10/2016 | MASTER TASK ORDER CONTRACT PROFESSIONAL ENGINEERING SERVICES HIGHWAY/ROADWAY DESIGN, TRAFFIC STUDIES AND DESIGN (FOR TASK ORDERS) CATEGORIES 1-7: AWARDED CATEGORIES 1, 2, 4, 5, 6, AND 7 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 129543 | DUR | 04/14/2017 | MASTER TASK ORDER CONTRACT FOR CONSULTING SERVICES AGREEMENT FOR SURFACE TRANSPORTATION PLANNING STUDIES CATEGORIES 1-5 - CATEGORIES AWARDED: 1,2,3, AND 4 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 124626 | Up To $1,550,682.09 | 04/03/2017 | Professional Engineering Services Highway/Roadway Design, Traffic Studies and Design Services Category 1: Major Highways and Arterial Streets Project 1: North Milwaukee Avenue, Logan Boulevard to Belmont Avenue | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
26985
|
C968990037 | Up To $11,395.27 | 10/17/2012 | Prof. Design Eng. Service for Oakwood Blvd. Viaduct over Metra/ICCR | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 81914 | DUR | 11/07/2012 | Professional Design Engineering Services - Project 3: Stony Island Avenue 95th to Midway Plaisance Traffic Signal Interconnect | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | C968990037 | Up To $999,835.09 | 08/01/2013 | Project 1: Professional Design Engineering Services - Oakwood Blvd. Viaduct over Metra/ICRR | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 63392 | Up To $3,000,000.00 | 04/08/2009 | Surface Transportation Planning Studies (Category 2, 3, 4) | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 82126 | Up To $274,315.00 | 02/08/2019 | PROFESSIONAL DESIGN ENGINEERING SERVICES/SYSTEMS MANAGER FOR PROJECT 3: SOUTH AREA INTERCONNECT PROJECTS | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 98030 | Up To $8,000,000.00 | 10/24/2012 | PROFESSIONAL TASK ORDER SERVICES: GROUP B) AIRPORT ENGINEERING (NON-FEDERAL) | CHICAGO DEPARTMENT OF AVIATION | Details | |
| CITY | 94825 | Up To $2,499,625.92 | 05/31/2013 | PROFESSIONAL DESIGN ENGINEERING SERVICES PHASE 1 -PROJECT 4: CANAL STREET VIADUCTS / TAYLOR STREET TO MADISON STREET | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 114941 | DUR | 12/21/2015 | MASTER TASK ORDER CONTRACT TASK ORDER SERVICES DESIGN ENGINEERING FOR COMPLETE STREETS PROJECT GROUPS 1-5: PROJECT GROUPS 1 AND 3 AWARDED | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 98050 | Up To $8,000,000.00 | 11/28/2012 | PROFESSIONAL TASK ORDER SERVICES: GROUP B) AIRPORT ENGINEERING (FEDERALLY FUNDED) | CHICAGO DEPARTMENT OF AVIATION | Details | |
| CITY | 704315 | Up To $1,500,000.00 | 12/29/2020 | PROFESSIONAL ENGINEERING SERVICES FOR TAYLOR STREET BRIDGE AND VIADUCT OVER THE SOUTH BRANCH OF THE CHICAGO RIVER | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 1204697 | Up To $10,000,000.00 | 01/10/2024 | MASTER TASK ORDER CONTRACT PROFESSIONAL DESIGN ENGINEERING SERVICES PHASE I AND II TASK ORDER SERVICES - GROUP 3: ROADWAY AND GROUP 4: TRAFFIC SIGNALS AND ROADWAY LIGHTING | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |