In order to view the Contract and Award Listings, you need to download Acrobat Reader.
Click on a column title to sort the records. For information and supporting documents concerning amendments, modifications and/or extensions to a contract, click the "Details" link in the search results.
DUR in the Award Amount column means that the contract award total Depends Upon Requirements. A Depends Upon Requirements contract is an indefinite quantities contract in which the city places orders as needed. The vendor is not guaranteed any particular contract award amount.
41 record(s) found
| Agency | Contract (PO) # | Specification # | Award amount | Award date | Commodity or service | Department | |
|---|---|---|---|---|---|---|---|
| CITY |
C016826
|
C906940008 | $750,000.00 | 06/20/1995 | FINAL DESIGN ENGINEERING SERVICES - CENTRAL AREA CIRCULATOR | OFFICE OF BUDGET & MANAGEMENT | Details |
| CITY |
T26905
|
B39062923 | DUR | 07/25/1994 | PH I & II DESIGN ENGINEERING-BALBO DR. VIADUCT-METRA/ICC RR | Details | |
| CITY |
T28252
|
B99611714 | DUR | 09/03/1999 | CONSTRUCTION MGT- CITYWIDE SEWER CONSTRUCTION PROJECTS | Details | |
| CITY | 48015 | Up To $1,780,732.84 | 11/13/2007 | Professional Construction Engineering for Roadway Projects US 41, West 79th street to West 92nd street | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 77028 | DUR | 12/22/2010 | Category 8: Task Order Construction Engineering Services for Residential Concrete & Miscellaneous Asphalt (RCMA) Norht Area, 1 thru 6 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
C013516
|
C906910005 | $5.34 | 10/11/2002 | PN83C013516 SERVICES | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | C968990037 | Up To $999,643.96 | 02/23/2004 | Prof Const. Servs. for Wash. St. Viaduct over I-90/94 and Monroe St. over I-90/94 e | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | B89254901 | DUR | 08/02/1999 | DESIGN ENGINEERING-VARIOUS ROADWAY IMPROVEMENT PROJECTS | Details | ||
| CITY | 118890 | DUR | 01/14/2016 | MASTER TASK ORDER CONTRACT PROFESSIONAL ENGINEERING SERVICES HIGHWAY/ROADWAY DESIGN, TRAFFIC STUDIES AND DESIGN (FOR TASK ORDERS) CATEGORIES 1-7: CATEGORIES 1, 2, AND 3 AWARDED | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T5906800113
|
B59068001 | Up To $1,000,000.00 | 02/22/1996 | DESIGN ENGINEERING F/VARIOUS SEWER DEPT PROJECTS | Details | |
| CITY |
T2961170609
|
B29611706 | Up To $400,000.00 | 02/01/1993 | CONSTRUCTION MANAGEMENT SERVICES-CITYWIDE SEWER CONSTRUCTION | Details | |
| CITY | 53021 | Up To $5,374,725.55 | 11/13/2007 | Professional Construction Engineering Services Residential Concrete and Miscellaneous Asphalt South and far South | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 56460 | Up To $5,000,000.00 | 07/19/2007 | Task Order Design Engineering Services (Project Categories 1-7) Roadway Design, Traffic Studies and Traffic Facilities Design Services | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T26806
|
B29068601 | DUR | 04/20/1993 | 1992-94 DESIGN ENGINEERING SERVICES-ARTERIAL STREETS | Details | |
| CITY |
T27192
|
B59611714 | DUR | 05/23/1996 | CONSTRUCTION MGT. SERVICES-CITYWIDE SEWER CONSTR PROJECTS | Details | |
| CITY | B79258801 | DUR | 05/08/2001 | DESIGN ENGINEERING PHASE II-TORRENCE AVE. BRIDGE OVER CALUMET RIVER | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T3906292301
|
B39062923 | Up To $645,951.00 | 07/27/1994 | PH. II, DESIGN ENGINEERING-CONGRESS PKWY ABOVE ICG RAILROAD | Details | |
| CITY | C925990002 | $354,219.00 | 05/01/2003 | NEW STREETS DESIGN ENG. SERVICES PROJECT F | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 221510 | Up To $6,599,890.72 | 06/27/2019 | PHASE II PROFESSIONAL DESIGN ENGINEERING SERVICES FOR DIVISION ST. BRIDGES OVER THE CHICAGO RIVER AND NORTH BRANCH CANAL AND DIVISION ST. ROADWAY IMPROVEMENT FROM KENNEDY EXPRESSWAY TO CLEVELAND AVE. | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T27740
|
B89068001 | DUR | 03/19/1999 | DESIGN ENGINEERING F/VARIOUS SEWER DEPT PROJECTS | Details | |
| CITY |
T27128
|
B59064603 | DUR | 02/17/1998 | PH I/II, DESIGN ENGINEERING-VAR, ROADWAY PROJECTS (IDOT/MFT) | Details | |
| CITY | C968990037 | $248,742.00 | 06/10/2002 | PROFESSIONAL ENGRG.SERV. FOR: WABASH AVE. BASCULE BR. REHAB. | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 63392 | Up To $2,000,000.00 | 02/25/2009 | Surface Transportation Planning Studies (Categories 2, 3) | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 109310 | DUR | 06/06/2013 | Professional Construction Enginering Services Category 4: Construction Engineering Services for Transit Projects Cermak Road Elevated (EL) CTA Green Line Station | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T28102
|
B99064603 | DUR | 02/28/2000 | ROADWAY DESIGN & CONSTRUCTION ENGINEERING | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | B49184203 | DUR | 08/22/1995 | PHASE I & II BRIDGE DESIGN ENGINEERING-N. HALSTED DRAWBRIDGE | Details | ||
| CITY | B89258802 | DUR | 04/15/1999 | ENGINEERING SERVICES, INSPECTIONS FOR SKYWAY TOLL BRIDGE | Details | ||
| CITY | 94825 | Up To $655,213.48 | 08/01/2013 | PROFESSIONAL DESIGN ENGINEERING SERVICES PHASE I AND II PROJECT 1 - SOUTH WATER STREET VIADUCT - BEAUBIEN CT. TO STETSON AVENUE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T27123
|
B59064603 | DUR | 11/20/1997 | PH I & II DESIGN ENGINEERING-VAR ROADWAY PROJECTS-CITY FUND | Details | |
| CITY | 140827 | DUR | 06/19/2018 | PROFESSIONAL SEWER CONSTRUCTION ENGINEERING SERVICES | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | B29184211 | Up To $4,000,000.00 | 08/22/2003 | ENGINEERING TASK ORDER SERVICES | CHICAGO DEPARTMENT OF AVIATION | Details | |
| CITY | C968990037 | $1,225,000.00 | 02/14/2003 | Professional Design Engineering Services | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T5961170901
|
B59611709 | Up To $576,968.00 | 08/22/1995 | CONSTR ENGR-CTA LAKE/WELLS SUBWAY MEZZ & PLATFORM RENOVATION | Details | |
| CITY |
C011588
|
C906900037 | $3,203.04 | 10/11/2002 | PN83C011588 MONTROSE AVE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 77925 | Up To $2,196,508.72 | 04/13/2010 | Prof. Eng. Services , Morgan St., EL CTA Green Line Station | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T27719
|
B89062926 | DUR | 11/10/1999 | STRUCTURAL ENGINEERING TASK ORDER SERVICES | CHICAGO DEPARTMENT OF AVIATION | Details |
| CITY |
T27602
|
B79258801 | DUR | 08/17/1998 | CONSTRUCTION ENGR SERVICES-VAR BRIDGE & TRANSIT PROJECTS-DUR | Details | |
| CITY |
T28101
|
B99064603 | DUR | 02/18/2000 | ROADWAY DESIGN & CONSTRUCTION ENGINEERING | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 1131763 | Up To $25,000,000.00 | 06/26/2023 | Details | |||
| CITY | 1204697 | Up To $10,000,000.00 | 11/29/2023 | Professional Design Engineering Services For Groups 2 & 3 Phase I And II Task Order Services, Groups - 2: Structures (Movable), 3: Roadway | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
355567
|
1296415 | Up To $15,000,000.00 | 09/01/2026 | Professional Sewer Construction Management Engineering Services - non-Target Market (Task Order Services) | DEPARTMENT OF WATER MANAGEMENT | Details |