In order to view the Contract and Award Listings, you need to download Acrobat Reader.
Click on a column title to sort the records. For information and supporting documents concerning amendments, modifications and/or extensions to a contract, click the "Details" link in the search results.
DUR in the Award Amount column means that the contract award total Depends Upon Requirements. A Depends Upon Requirements contract is an indefinite quantities contract in which the city places orders as needed. The vendor is not guaranteed any particular contract award amount.
10 record(s) found
| Agency | Contract (PO) # | Specification # | Award amount | Award date | Commodity or service | Department | |
|---|---|---|---|---|---|---|---|
| CITY | 192597 | Up To $9,700,000.00 | 03/27/2018 | PROFESSIONAL DESIGN SERVICES FOR THE PARTIAL RELOCATION OF TAXIWAYS ALPHA AND BRAVO AT O'HARE INTERNATIONAL AIRPORT | CHICAGO DEPARTMENT OF AVIATION | Details | |
| CITY | 94825 | Up To $626,449.54 | 10/17/2017 | TRANSFERRED FROM TENG & ASSOC., PO #27110 - PROFESSIONAL DESIGN ENGINEERING CATEGORY 6: MOVABLE BRIDGES PROJECT 7 - GRAND AVENUE BRIDGE OVER THE NORTH BRANCH CHICAGO RIVER | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 98050 | Up To $8,000,000.00 | 12/06/2012 | PROFESSIONAL TASK ORDER SERVICES: GROUP B) AIRPORT ENGINEERING (FEDERALLY FUNDED) | CHICAGO DEPARTMENT OF AVIATION | Details | |
| CITY | 98030 | Up To $8,000,000.00 | 10/15/2012 | PROFESSIONAL TASK ORDER SERVICES: GROUP B) AIRPORT ENGINEERING (NON-FEDERAL) | CHICAGO DEPARTMENT OF AVIATION | Details | |
| CITY | 127930 | DUR | 01/12/2016 | PROFESSIONAL ARCHITECTURAL AND ENGINEERING DESIGN SERVICES | DEPT OF GENERAL SERVICES | Details | |
| CITY | 118890 | DUR | 01/14/2016 | MASTER TASK ORDER CONTRACT PROFESSIONAL ENGINEERING SERVICES HIGHWAY/ROADWAY DESIGN, TRAFFIC STUDIES AND DESIGN (FOR TASK ORDERS) CATEGORIES 1-7: CATEGORY 4 AWARDED | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 118428 | DUR | 11/20/2014 | Professional Construction Engineering Services Category 8 - Project 2: Adams Street Bascule Bridge and Viaduct over Union Station | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
40210
|
C96899037 | Up To $440,238.51 | 07/21/2016 | 35TH STREET PEDESTRIAN BRIDGE OVER METRA ELECTRIC CN/ICRR AND LAKE SHORE DRIVE (REQUISITION 103944/REPLACES PO 9941/TRANSFER AGREEMENT) | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
32043
|
54085 | Up To $3,650,531.19 | 07/08/2015 | Architectural Task Order Services Agreement (Previously PO#16896) | CHICAGO DEPARTMENT OF AVIATION | Details |
| CITY |
32044
|
78054 | Up To $324,652.00 | 08/07/2015 | ARCHITECTURAL AND ENGINEERING DESIGN SERVICES FOR THE SOUTH AIR TRAFFIC CONTROL TOWER; O'HARE MODERNIZATION PROGRAM COMPLETION PHASE (PREVIOUSLY PO#22824) | OHARE MODERNIZATION PROJECT | Details |