In order to view the Contract and Award Listings, you need to download Acrobat Reader.
Click on a column title to sort the records. For information and supporting documents concerning amendments, modifications and/or extensions to a contract, click the "Details" link in the search results.
DUR in the Award Amount column means that the contract award total Depends Upon Requirements. A Depends Upon Requirements contract is an indefinite quantities contract in which the city places orders as needed. The vendor is not guaranteed any particular contract award amount.
64 record(s) found
| Agency | Contract (PO) # | Specification # | Award amount | Award date | Commodity or service | Department | |
|---|---|---|---|---|---|---|---|
| CITY |
T27125
|
B59064603 | DUR | 03/06/1998 | PH I/II DESIGN ENGINEERING-VAR ROADWAY PROJECTS (CITY FUND) | Details | |
| CITY | 94825 | Up To $774,696.51 | 07/19/2013 | PROFESSIONAL DESIGN ENGINEERING SERVICES PROJECT 8 - CORTLAND STREET BRIDGE OVER THE CHICAGO RIVER | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 90070 | DUR | 07/11/2011 | Professional Sewer Construction Engineering Services | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 44713 | Up To $3,000,000.00 | 12/12/2006 | Environmental Assessment and Engineering Services (Various Categories) | DEPARTMENT OF ENVIROMENT | Details | |
| CITY | 56460 | Up To $5,000,000.00 | 07/31/2007 | Task Order Design Engineering Services (Project Categories 1-7) Roadway Design, Traffic Studies and Traffic Facilities Design Services | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 48015 | Up To $667,388.02 | 09/26/2006 | Construction Engineering Services-Washington Street Loop Lighting:Michigan Ave to Wacker Dr. | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | C925990002 | $118,378.00 | 03/23/2005 | Design Eng Services Landscaped Median Improvements Ogden Avenue: Fry Street to Randolph Street | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T8906800107
|
B89068001 | DUR | 03/11/1999 | DESIGN ENGINEERING F/VARIOUS SEWER DEPT PROJECTS | Details | |
| CITY | C925990002 | Up To $400,000.00 | 07/01/2003 | CITY FUNDS- ROADWAY CONSTRUCTION ENGINEERING SERVICES | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T3906292309
|
B39062923 | Up To $182,539.00 | 08/24/1994 | PH III CONSTRUCTION MGT.-OGDEN VIADUCT DEMOLITION | Details | |
| CITY |
T4918420304
|
B49184203 | Up To $402,943.00 | 04/26/1995 | PHASE I, BRIDGE DESIGN ENGINEERING-SOUTH ASHLAND BRIDGE | Details | |
| CITY |
T27541
|
B79184207 | DUR | 05/27/1997 | BRIDGE INSPECTION ENGINEERING SERVICES-VARIOUS LOCATIONS | Details | |
| CITY | 134313 | Up To $677,361.91 | 08/09/2016 | PROFESSIONAL DESIGN ENGINEERING SERVICES -PHASE 1- CHICAGO AVENUE BRIDGE OVER THE CHICAGO RIVER | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | C925990002 | $63,685.00 | 11/05/2002 | DESIGN OF ROADWAY & ROADSIDE ENHANCEMENTS | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T28253
|
B99611714 | DUR | 11/05/1999 | CONSTRUCTION MGT- CITYWIDE SEWER CONSTRUCTION PROJECTS | Details | |
| CITY |
C028720
|
C925990001 | $372,789.23 | 07/19/2000 | PROFESSIONAL SERVICES-LSD-47TH STREET VIADUCT | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | B79258801 | DUR | 08/18/1998 | CONSTRUCTION ENGR SERVICES-CHICAGO SKYWAY-DUR | Details | ||
| CITY | C9680037 | $400,000.00 | 05/16/2003 | DESIGN ENGINEERING SERVICES FOR CARROLL AVENUE MOVEABLE BRIDGE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T2961170604
|
B29611706 | Up To $400,000.00 | 01/22/1993 | CONSTRUCTION MANAGEMENT SERVICES-CITYWIDE SEWER CONSTRUCTION | Details | |
| CITY | 44186 | Up To $10,000,000.00 | 03/22/2007 | GENERAL AVIATION PLANNING TASK ORDER | CHICAGO DEPARTMENT OF AVIATION | Details | |
| CITY | 140827 | DUR | 06/11/2018 | PROFESSIONAL SEWER CONSTRUCTION ENGINEERING SERVICES | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY |
T27927
|
B89259301 | DUR | 05/01/1999 | TRAFFIC ENGINEERING | Details | |
| CITY | C968990037 | $3,255,745.62 | 03/18/2004 | Skyway Westbound Deck Reconstruction | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T27194
|
B59611714 | DUR | 05/23/1996 | CONSTRUCTION MGT. SERVICES-CITYWIDE SEWER CONSTR PROJECTS | Details | |
| CITY |
T27285
|
B69068603 | DUR | 04/29/1997 | CONSTRUCTION ENGINEERING SERVICES-VARIOUS TRAFFIC PROJECTS | Details | |
| CITY | C925990002 | Up To $3,000,000.00 | 07/08/2005 | CITY WIDE ROADWAY CONSTRUCTION ENGINEERING SERVICES | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T5906800117
|
B59068001 | Up To $1,000,000.00 | 02/22/1996 | DESIGN ENGINEERING F/VARIOUS SEWER DEPT PROJECTS | Details | |
| CITY | 63392 | Up To $3,000,000.00 | 03/10/2009 | Surface Transportation Planning Studies (Categories 1, 2, 3) | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 108078 | Up To $4,499,837.45 | 12/18/2013 | PROFESSIONAL CONSTRUCTION ENGINEERING SERVICES LAKEFRONT TRAIL IMPROVEMENTS-NAVY PIER FLYOVER | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 98329 | DUR | 05/30/2012 | Professional Design Engineering Services Cermak Road EL CTA Green Line Station Project | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 84314 | Up To $949,032.33 | 05/13/2011 | Professional Bridge Construction Engineering Services, Category 8: Madison Street Viaduct over Union Station | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T28262
|
B99611722 | Up To $900,000.00 | 12/09/1999 | RFP/RFQ TASK ORDER CONSTRUCTION FIELD SUPERVISION-NON-FAA | CHICAGO DEPARTMENT OF AVIATION | Details |
| CITY |
T26906
|
B39062923 | DUR | 07/24/1994 | PH. I & II DESIGN ENGINEERING-S. DAMEN AVE. OVERPASS | Details | |
| CITY |
T27925
|
B89259301 | DUR | 03/15/2001 | TRAFFIC ENGINEERING | Details | |
| CITY |
T27926
|
B89259301 | DUR | 05/01/1999 | TRAFFIC ENGINEERING | Details | |
| CITY |
T27616
|
B79258801 | Up To $3,517,005.00 | 04/11/2000 | DESIGN ENGINEERING PHASE II-TORRENCE AVE. BRIDGE OVER CALUMET RIVER | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
C017778
|
C906940008 | $850,000.00 | 04/27/1995 | FINAL DESIGN ENGINEERING SERVICES - CENTRAL AREA CIRCULATOR | OFFICE OF BUDGET & MANAGEMENT | Details |
| CITY | 129543 | DUR | 09/28/2016 | MASTER TASK ORDER CONTRACT FOR CONSULTING SERVICES AGREEMENT FOR SURFACE TRANSPORTATION PLANNING STUDIES CATEGORIES 1-5: AWARDED CATEGORIES ONE, TWO, THREE, AND FOUR | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 118890 | DUR | 11/14/2015 | MASTER TASK ORDER CONTRACT PROFESSIONAL ENGINEERING SERVICES HIGHWAY/ROADWAY DESIGN, TRAFFIC STUDIES AND DESIGN (FOR TASK ORDERS) CATEGORIES 1-7: CATEGORIES 1, 2, AND 6 AWARDED | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 127930 | DUR | 01/07/2016 | PROFESSIONAL ARCHITECTURAL AND ENGINEERING DESIGN SERVICES | DEPT OF GENERAL SERVICES | Details | |
| CITY | 114941 | DUR | 10/07/2015 | MASTER TASK ORDER CONTRACT TASK ORDER SERVICES DESIGN ENGINEERING FOR COMPLETE STREETS PROJECT GROUPS 1-5: GROUP 2 AWARDED AND GROUP 3 AWARDED | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T27284
|
B69068603 | DUR | 04/29/1997 | TRAFFIC ENGINEERING STUDIES & DESIGN SERVICES | Details | |
| CITY | C968990037 | $1,961,067.85 | 08/13/2001 | CONSTRUCTION ENGINEERING SERVICES | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T27884
|
B89189604 | DUR | 07/06/1999 | TRANSPORTATION CONSULTING | Details | |
| CITY | C925990002 | $225,000.00 | 03/25/2002 | DESIGN OF ROADWAY & ROADSIDE ENHANCEMENTS | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
C029067
|
C925990002 | $135,364.00 | 01/03/2001 | DESIGN OF ROADWAY & ROADSIDE ENHANCEMENTS | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | C968990037 | $2,856,118.46 | 11/19/2001 | WACKER DRIVE RECONSTRUCTION/STATE ST TO MICHIGAN AVE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 1296 | Up To $2,500,000.00 | 12/29/2003 | SURFACE TRANSPORTATION PLANNING STUDIES | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | C968990037 | Up To $699,879.80 | 09/20/2007 | Professional Design Eng. Serv.-Chicago Ave. Bridge over The Chicago River | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 74852 | Up To $6,000,000.00 | 08/09/2010 | Construction Engineering for Roadway Projects (City Wide) | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | C925990002 | $77,000.00 | 09/19/2002 | DESIGN OF ROADWAY & ROADSIDE ENHANCEMENTS | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T27097
|
B59064603 | DUR | 04/30/1997 | PH I & II, DESIGN ENGINEERING-VARIOUS ROADWAY PROJECTS | Details | |
| CITY | 28081 | DUR | 03/11/2008 | MASTER CONSULTING AGREEMENT-BICYCLE AND PEDESTRIAN: EDUCATION, PROMOTION AND TECHNICAL SERVICES (CATEGORIES 1,2,3,4&5) | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY |
T28085
|
B99064603 | DUR | 02/18/2000 | ROADWAY DESIGN & CONSTRUCTION ENGINEERING | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
T28119
|
B99064603 | DUR | 02/22/2000 | ROADWAY DESIGN & CONSTRUCTION ENGINEERING | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
T28120
|
B99064603 | DUR | 02/22/2000 | ROADWAY DESIGN & CONSTRUCTION ENGINEERING | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY | 137279 | DUR | 05/25/2018 | PROFESSIONAL SEWER DESIGN ENGINEERING SERVICES | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY | 46990 | Up To $1,000,000.00 | 08/08/2006 | Professional Sewer Construction Engineering Services | DEPARTMENT OF WATER MANAGEMENT | Details | |
| CITY |
T2906860110
|
B29068601 | Up To $776,532.00 | 04/07/1993 | 1992-94 DESIGN ENGINEERING SERVICES-ARTERIAL STREETS | Details | |
| CITY |
C029178
|
C925990002 | $2,220,794.00 | 01/17/2001 | DESIGN OF ROADWAY & ROADSIDE ENHANCEMENTS | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
| CITY |
T3906292201
|
B39062922 | Up To $825,000.00 | 03/17/1994 | ENGINEERING SERVICES FOR CITYWIDE BRIDGE INSPECTIONS | Details | |
| CITY | 1195802 | Up To $2,673,731.00 | 11/27/2024 | PROFESSIONAL DESIGN ENGINEERING SERVICES FOR JACKSON BOULEVARD BASCULE BRIDGE OVER THE SOUTH BRANCH OF THE CHICAGO RIVER | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 1204697 | Up To $10,000,000.00 | 12/29/2023 | MASTER CONSULTANT AGREEMENT FOR PROFESSIONAL DESIGN ENGINEERING SERVICES FOR GROUPS 1 THROUGH 4, PHASE I AND II FOR TASK ORDER SERVICES | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
| CITY | 1131763 | Up To $25,000,000.00 | 08/10/2023 | PROFESSIONAL CONSTRUCTION ENGINEERING SERVICES FOR CITY WIDE CDOT ROADWAY AND BRIDGE PROJECTS TASK ORDER SERVICES MASTER CONSULTING AGREEMENTS | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |