City of Chicago

Procurement Services

We are the contracting authority for the procurement of goods and services for the City of Chicago

Contracts for Vendor

Contracts for GFT INFRASTRUCTURE, INC.

In order to view the Contract and Award Listings, you need to download Acrobat Reader.

Click on a column title to sort the records. For information and supporting documents concerning amendments, modifications and/or extensions to a contract, click the "Details" link in the search results.

DUR in the Award Amount column means that the contract award total Depends Upon Requirements. A Depends Upon Requirements contract is an indefinite quantities contract in which the city places orders as needed. The vendor is not guaranteed any particular contract award amount.

10 record(s) found

Agency Contract (PO) # Specification # Award amount Award date Commodity or service Department
CITY 1197349 Up To $13,063,062.62 05/15/2026 TRANSFER FROM PO 282542 - Professional Design Engineering Services for the Management of City's Underground Infrastructure CHICAGO DEPARTMENT OF TRANSPORTATION Details
CITY 1204697 Up To $6,848,789.92 05/15/2026 TRANSFER FROM PO 223980 - MASTER TASK ORDER CONTRACT PROFESSIONAL DESIGN ENGINEERING SERVICES FOR GROUPS 2 THROUGH 4 PHASE I AND II TASK ORDER SERVICES, GROUPS - 2: STRUCTURES (MOVABLE, 3: ROADWAY & 4: TRAFFIC SIGNALS & ROADWAY LIGHTING CHICAGO DEPARTMENT OF TRANSPORTATION Details
CITY 132659 Up To $9,405,749.61 05/26/2026 TRANSFER FROM PO 47314 - PROFESSIONAL QUALITY CONTROL AND QUALITY ASSURANCE CONSTRUCTION INSPECTION ENGINEERING SERVICES (QA/QC) CHICAGO DEPARTMENT OF TRANSPORTATION Details
CITY 140827 Up To $2,828,363.24 05/28/2026 TRANSFER FROM PO 241983 - PROFESSIONAL SEWER CONSTRUCTION ENGINEERING SERVICES DEPARTMENT OF WATER MANAGEMENT Details
CITY 579313 Up To $2.00 04/30/2026 Transfer from PO 100786 Phase 1 & Phase 2 Design Engineering & Architectural Services for Replacement of the State/Lake Loop Elevated CTA Station CHICAGO DEPARTMENT OF TRANSPORTATION Details
CITY 1131763 Up To $16,141,253.58 04/29/2026 TRANSFER FROM PO 200123 - PROFESSIONAL CONSTRUCTION ENGINEERING SERVICES FOR CITY-WIDE CDOT ROADWAY AND BRIDGE PROJECTS - TASK ORDER SERVICES- MASTER CONSULTING AGREEMENTS CHICAGO DEPARTMENT OF TRANSPORTATION Details
CITY 140827 DUR 05/26/2026 TRANSFER FROM PO 71114 - PROFESSIONAL SEWER CONSTRUCTION ENGINEERING SERVICES DEPARTMENT OF WATER MANAGEMENT Details
CITY 137797 Up To $3,307,227.85 02/05/2026 TRANSFERRED FROM PO 241988 TERM AGREEMENTS FOR CONSTRUCTION MANAGEMENT SERVICES NON-TARGET MARKET DEPARTMENT OF WATER MANAGEMENT Details
CITY 129543 Up To $4,595,682.21 02/10/2026 TRANSFERRED FROM PO38958 - MASTER TASK ORDER CONTRACT FOR CONSULTING SERVICES AGREEMENT FOR SURFACE TRANSPORTATION PLANNING STUDIES CATEGORIES 1-5: AWARDED CATEGORIES ONE, TWO, AND FOUR CHICAGO DEPARTMENT OF TRANSPORTATION Details
CITY 1155535 Up To $596,256.40 02/11/2026 TRANSFERED FROM PO 179220 RFQ FOR PROFESSIONAL DESIGN ENGINEERING SERVICES FOR 92ND STREET BASCULE BRIDGE OVER THE CALUMET RIVER - CDOT PROJECT NO. E-7-479 CHICAGO DEPARTMENT OF TRANSPORTATION Details