110 record(s) found
Agency | Contract (PO) # | Specification # | Award amount | Award date | Commodity or service | Department | |
---|---|---|---|---|---|---|---|
CITY | 127336 | Up To $329,300.00 | 09/25/2014 | Non-Federal Reimbursable Agreement Between Department of Transportation and City of Chicago O¿Hare Modernization Program | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 1197785 | Up To $19,874,189.38 | 01/29/2020 | DESIGN NAVAIDS RELOCATION FOR THE RUNWAY 9R-27L EXTENSION PROJECT AT O'HARE INTERNATIONAL AIRPORT- PHASE 2B | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 1196386 | Up To $19,874,189.38 | 01/09/2020 | FEDERAL AVIATION ADMINISTRATION FOR DESIGN NAVAIDS RELOCATION FOR THE RUNWAY 9R-27L EXTENSION PROJECT AT O'HARE INTERNATIONAL AIRPORT- PHASE 2B | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 132208 | Up To $96,983.69 | 05/11/2015 | Federal Aviation Administration OMP Related Work | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 117579 | Up To $2,190,378.00 | 05/24/2013 | OMP Completion Phase 2A Fiber Optic Transmission System (FOTS) serving Runway 10R-28L, South ATCT, RTR-U, and Associated Facilities at ORD Airport | OHARE MODERNIZATION PROJECT | Details | |
CITY | 59375 | Up To $1,551,000.00 | 08/07/2007 | Navaids for new Runway 9L-27R | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 79727 | Up To $1,821,000.00 | 11/03/2009 | Establishment of NAVAIDS for new Runway 10C-28C | OHARE MODERNIZATION PROJECT | Details | |
CITY | 86879 | Up To $621,576.30 | 06/03/2010 | To provide space for the warehousing of OMP equipment and supplies to expedite all FAA work | OHARE MODERNIZATION PROJECT | Details | |
CITY | 724642 | Up To $1,337,540.00 | 04/02/2018 | Removal of NAVAIDS and FOTS as part of Runway 15-33 Decommissioning at O¿Hare International Airport ¿ OMP Completion Phase 2A | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 51148 | Up To $132,799.00 | 09/19/2006 | Preparation of Environmental Impact Statement (AGL-342) | OHARE MODERNIZATION PROJECT | Details | |
CITY | 54185 | Up To $941,000.00 | 01/08/2007 | Installation of an Automated Surveillance Radar Model 9 (ASR-9) | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 54186 | Up To $6,550,000.00 | 01/08/2007 | Establishment of Airport Surface Detection Equipment (ASDE) | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 32523 | Up To $63,000.00 | 01/13/2005 | Preparation of EIS | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 56729 | Up To $1,818,985.00 | 04/16/2007 | Establishment of Remote Transmitter/Receiver Site | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 61165 | Up To $708,328.00 | 10/30/2007 | Expedited Development and Preparation of EIS | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 117283 | Up To $232,180.00 | 05/08/2013 | Design Review of NAVAIDs for new Runway 10R-28L at O¿Hare International Airport ¿ OMP Completion Phase | OHARE MODERNIZATION PROJECT | Details | |
CITY | 32797 | Up To $2,375,960.00 | 01/28/2005 | AGL-342 | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 32521 | Up To $2,375,960.00 | 01/13/2005 | Preparation of EIS | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 336160 | Up To $50,000.00 | 11/23/2016 | Communication Facility Planning at O¿Hare International Airport | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 1187952 | Up To $115,833.33 | 09/05/2019 | FAA ENGINEERING TO RELOCATE LLWAS 16/RU11 AT O'HARE | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 504183 | Up To $4,164,080.30 | 07/24/2017 | OMP Relocation of Airport Surveillance Radar | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 446855 | Up To $790,042.11 | 05/01/2017 | O¿Hare Modernization Program Establishment of Precision Approach Path Indicators (PAPI) on Runway 9L-27R at O¿Hare International Airport | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY |
8018
|
32570 | $232,575.00 | 01/13/2005 | Preparation of EIS | CHICAGO DEPARTMENT OF AVIATION | Details |
CITY |
8020
|
32572 | $3,118,510.00 | 01/13/2005 | Preparation of EIS | CHICAGO DEPARTMENT OF AVIATION | Details |
CITY |
8022
|
32575 | $75,633.55 | 01/13/2005 | Preparation of EIS | CHICAGO DEPARTMENT OF AVIATION | Details |
CITY | 48784 | Up To $2,928,858.00 | 07/10/2006 | Power System Equipment: North Airport Traffic Control Tower | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 84372 | Up To $317,000.00 | 03/16/2010 | RWY 32LThreshold Relocation | OHARE MODERNIZATION PROJECT | Details | |
CITY | 105865 | Up To $665,100.00 | 03/09/2012 | Establish new single mode fiber loops designated as FOL600 & FOL700 | OHARE MODERNIZATION PROJECT | Details | |
CITY | 55076 | Up To $3,035,000.00 | 02/05/2007 | Electronic Equipment System | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 859537 | Up To $1,723,586.69 | 08/20/2018 | PHASING REVIEW FOR THE PROPOSED TERMINAL AREA PLAN AND ENVIRONMENTAL ASSESSMENTS AT O'HARE | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 386238 | Up To $291,220.00 | 02/06/2017 | Relocation of Low Level Wind Shear Alert System I/ASDE-X Remote Unit 2 at O¿Hare International Airport | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 313031 | Up To $496,288.00 | 10/19/2016 | FAA Staffing for O¿Hare Modernization Program Work Relating to the Chicago Area Modernization Program Office | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 533449 | Up To $19,276,761.45 | 08/31/2017 | Establishment of NAVAID¿s for New Runway 9C-27C at O¿Hare International Airport OMP Completion Phase 2B | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 51645 | Up To $115,494.00 | 10/10/2006 | Consultant Services | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 55078 | Up To $12,655.00 | 02/05/2007 | Installation of the Type 1 OEP Power System | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 45024 | Up To $529,472.00 | 03/10/2006 | MOA No. AGL-404 | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 32793 | Up To $192,000.00 | 01/28/2005 | AGL-359 | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 32794 | Up To $75,634.00 | 01/28/2005 | AGL-345 | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 32524 | Up To $3,118,510.00 | 01/13/2005 | Preparation of EIS | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 32526 | Up To $75,633.55 | 01/13/2005 | Preparation of EIS | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY |
8019
|
32571 | $63,000.00 | 01/13/2005 | Preparation of EIS | CHICAGO DEPARTMENT OF AVIATION | Details |
CITY | 101906 | Up To $923,185.12 | 11/07/2011 | RWY 09R Glide Slope Upgrade to Capture Effect | OHARE MODERNIZATION PROJECT | Details | |
CITY | 83673 | Up To $100,000.00 | 02/24/2010 | OMP NAVAIDS Planning for Runways 10R-28L, 9C-27C, and 9R Extension | OHARE MODERNIZATION PROJECT | Details | |
CITY | 83674 | Up To $75,000.00 | 02/24/2010 | Completion Phase FOTS Planning | OHARE MODERNIZATION PROJECT | Details | |
CITY | 87237 | Up To $1,500,000.00 | 06/17/2010 | OMP Doppler VOR Relocation Elevated Counterpoise Engineering Design, Fabricate, and Install | OHARE MODERNIZATION PROJECT | Details | |
CITY | 74980 | Up To $1,938,323.00 | 06/08/2009 | Remote Transmitter/Receiver: Sites R and S | OHARE MODERNIZATION PROJECT | Details | |
CITY | 876033 | Up To $227,600.00 | 09/06/2018 | DESIGN NAVAIDS RELOCATION FOR THE RUNWAY 9R-27L EXTENSION PROJECT AT O'HARE INTERNATIONAL AIRPORT- PHASE 2A | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 810514 | Up To $150,000.00 | 06/29/2018 | TECHNICAL OPERATIONS PERSONNEL FOR OMP PROJECTS AT O'HARE SUPPLIER | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 924185 | Up To $50,000.00 | 10/23/2018 | REDESIGN OF THE FIBER OPTICS TRANSMISSION SYSTEM (FOTS) | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 83671 | Up To $560,000.00 | 02/24/2010 | OMP Doppler VOR Relocation Engineering Design | OHARE MODERNIZATION PROJECT | Details | |
CITY | 83672 | Up To $50,000.00 | 02/24/2010 | Completion Phase Communication Facility Planning | OHARE MODERNIZATION PROJECT | Details | |
CITY | 51250 | Up To $33,000.00 | 09/27/2006 | FAA 2003 GL8000086 | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY |
8017
|
32568 | $2,375,960.00 | 01/13/2005 | Preparation of EIS | CHICAGO DEPARTMENT OF AVIATION | Details |
CITY | 32796 | Up To $859,711.00 | 01/28/2005 | AGL-340: MOA between FAA & City of Chicago | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 134007 | Up To $1,056,280.00 | 08/07/2015 | FAA OMP related work. For maintenance cost associates with the South Traffic Control Tower | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 134478 | Up To $249,557.59 | 09/01/2015 | Federal Aviation Administration OMP Related Work | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 124142 | Up To $4,536,293.88 | 04/02/2014 | Establishment of NAVAID¿s and LL WAS Relocation for new Runway 10R-28L at O¿Hare International Airport ¿ OMP Completion Phase 2A | OHARE MODERNIZATION PROJECT | Details | |
CITY | 87238 | Up To $275,000.00 | 06/17/2010 | OMP Completion Phase FOTS - Procure FOTS Equipment | OHARE MODERNIZATION PROJECT | Details | |
CITY |
22187
|
86065 | Up To $2,149,809.00 | 04/30/2010 | Staffing to expedite all FAA work for the preparation of Flight & Instrument Approach Procedures, Airspace, and Airport Obstruction Analysis | OHARE MODERNIZATION PROJECT | Details |
CITY | 117282 | Up To $473,725.00 | 05/08/2013 | Establishment of Cab Glass Shade Systems at North ATCT at O'Hare International Airport - OMP Phase 1 | OHARE MODERNIZATION PROJECT | Details | |
CITY | C918020002 | $175,000.00 | 03/28/2002 | FAA'S RISK ASSESSMENT STUDY FOR 13C PROCEDURE | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 33051 | Up To $472,280.00 | 01/27/2005 | AGL-371, MOA | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 32788 | Up To $63,000.00 | 01/28/2005 | AGL-358 | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 42596 | Up To $160,000.00 | 12/14/2005 | FAA: Environmental Impact System | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 56727 | Up To $148,361.00 | 04/16/2007 | Installation of Automated Surveillance Radar Model | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 749907 | $1,337,540.00 | 04/26/2018 | Removal of NAVAIDS and FOTS as part of Runway 15-33 Decommissioning at O¿Hare International Airport ¿ OMP completion phase 2A | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 875024 | Up To $100,000.00 | 09/06/2018 | PRELIMINARY DESIGN REIMBURSABLE AGREEMENT FOR FIBER OPTICS TRANSMISSION SYSTEM (FOTS) FOR RUNWAY 9R-27L EXTENSION | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 116490 | Up To $296,260.00 | 04/10/2013 | Relocation of Low Level Windshear Alert System Station 15/ASDE-XRU 10 at O'Hare International Airport | OHARE MODERNIZATION PROJECT | Details | |
CITY | 32525 | Up To $470,280.00 | 01/13/2005 | Preparation of EIS | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 50445 | Up To $93,824.00 | 08/30/2006 | AGL-439 | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 45025 | Up To $54,297.50 | 03/10/2006 | MOA AGL-389 | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 42597 | Up To $150,000.00 | 12/14/2005 | FAA: Environmental Impact System | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 117580 | Up To $896,714.64 | 05/24/2013 | Establishment of Remote Transmitter/Receiver Site U (RTR-U), Special Purpose Area (SPA) and Hazmat Buildings at ORD Airport | OHARE MODERNIZATION PROJECT | Details | |
CITY | 125334 | Up To $200,000.00 | 06/06/2014 | Operations Manpower for OMP Projects at O¿Hare International | OHARE MODERNIZATION PROJECT | Details | |
CITY | 82931 | Up To $100,000.00 | 02/03/2010 | Plan for the South Airfield Surveillance Radar Coverage | OHARE MODERNIZATION PROJECT | Details | |
CITY | 67966 | Up To $317,500.00 | 08/08/2008 | Planning and Siting of a South Air Traffic Control Tower | OHARE MODERNIZATION PROJECT | Details | |
CITY | 66354 | Up To $190,000.00 | 06/09/2008 | Navaids Phase 1: OMP | OHARE MODERNIZATION PROJECT | Details | |
CITY | 1187955 | Up To $115,833.33 | 09/05/2019 | FAA ENGINEERING TO RELOCATE RTR-U AT O'HARE | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 63786 | Up To $46,760.00 | 02/15/2008 | AGL-475 | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 386245 | Up To $2,875,785.00 | 02/06/2017 | OMP Runway 9C-27C NAVAIDS Establishment of Distance Measuring Equipment and Decommissioning of Very High Frequency Omnidirectional Range | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 434512 | Up To $133,810.00 | 04/12/2017 | Relocation of Air Traffic Control (ATC) Frequencies | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 409869 | Up To $3,426,220.00 | 03/09/2017 | OMP Completion Phase Fiber Optic Transmission System (FOTS) | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 134484 | Up To $2,854,637.76 | 09/01/2015 | Removal of NAVAIDS and FOTS as part of runway 14L-32R decommissioning at O¿Hare International Airport ¿ OMP completion Phase 2A | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 48785 | Up To $5,289,000.00 | 07/10/2006 | Reconfiguration of ORD Air Traffic Control Tower | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 54606 | Up To $2,872,708.00 | 01/23/2007 | FOTS Phase I | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 69096 | Up To $170,000.00 | 10/01/2008 | Relocate Doppler | OHARE MODERNIZATION PROJECT | Details | |
CITY | 54184 | Up To $1,419,601.00 | 01/08/2007 | Installation of Navaids | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 54187 | Up To $305,000.00 | 01/08/2007 | The Relocation of Low-Level Windshear Alert System (LLWAS) | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 42599 | Up To $162,892.50 | 12/14/2005 | MOA Number AGL-389 | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 39152 | Up To $256,183.00 | 08/09/2005 | Technical Services | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 32522 | Up To $232,575.00 | 01/13/2005 | Preparation of EIS | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY |
8021
|
32574 | $470,280.00 | 01/13/2005 | Preparation of EIS | CHICAGO DEPARTMENT OF AVIATION | Details |
CITY | 120403 | Up To $5,092,500.00 | 10/04/2013 | OMP North Airfield Remote Surface Movement Radar (SMR) Design, Construction, Installation, Tune-up, Optimization, and Commission | OHARE MODERNIZATION PROJECT | Details | |
CITY | 89480 | Up To $200,000.00 | 08/26/2010 | Operations Manpower for OMP Projects at O'Hare International Airport | OHARE MODERNIZATION PROJECT | Details | |
CITY | 88212 | Up To $582,000.00 | 07/16/2010 | SATCT Engineering Support | OHARE MODERNIZATION PROJECT | Details | |
CITY | 497811 | Up To $166,010.00 | 07/14/2017 | FAA Engineering Design Review Staffing for O'Hare Modernization | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 1242250 | Up To $1,254,060.00 | 02/24/2022 | PRECISION APPROACH PATH INDICATORS (PAPI) ON RUNWAY 10R-28L AT ORD | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 1205015 | Up To $539,075.00 | 06/09/2020 | FAA ENGINEERING AND CONSTRUCTION OVERSIGHT TO RELOCATE THE RUNWAY 22R LOCALIZER AT O'HARE | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 1208231 | Up To $902,544.00 | 08/05/2020 | FAA FOTS IMPLEMENTATION FOR RUNWAY 9R/2L EXTENSION AT O'HARE | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 1209123 | Up To $1,096,887.33 | 08/21/2020 | FAA FOTS WORK ASSOCIATED WITH TAXIWAY A/B CONSTRUCTION AT O'HARE SUPPLIER | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 1268104 | Up To $1,288,063.08 | 03/03/2023 | FAA RELOCATE ORD-U RTR IMPLEMENTATION AT O'HARE | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 1281041 | Up To $219,294.00 | 09/06/2023 | FAA RELOCATION OF LOW LEVEL WIND SHEAR ALERT SYSTEM STATION 16/ASDE-X REMOTE UNIT 11 AT O'HARE | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 1281499 | Up To $3,201,550.00 | 09/13/2023 | FAA NORTH AIRFIELD REMOTE SURFACE MOVEMENT RADAR SUPPLEMENTAL DESIGN RA AT O'HARE | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 1281033 | Up To $17,722.80 | 09/06/2023 | FAA LIMITATED DESIGN AND IMPLEMENTATION RA AT O'HARE | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 1277512 | Up To $1,469,625.24 | 07/18/2023 | FAA EST OF PAPI ON RUNWAY 9L-27R AT O'HARE | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 1295025 | Up To $54,594.00 | 03/18/2024 | FAA NON-FEDERAL LIMITED DESIGN AND IMPLEMENTATION REIMBURSABLE AGREEMENT V85 | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 1319775 | Up To $162,783.00 | 02/27/2025 | FAA NON-FEDERAL LIMITED DESIGN AND IMPLEMENTATION REIMBURSABLE AGREEMENT V85 | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY | 1290147 | Up To $9,537,766.67 | 01/11/2024 | FAA OMP SOUTH AIRFILED REMOTE SURFACE MOVEMENT RADAR (SMR) DESIGN, CONSTRUCTION, INSTALLATION, TUNE UP, OPTIMIZATION | CHICAGO DEPARTMENT OF AVIATION | Details | |
CITY |
324413
|
1333440 | Up To $771,100.00 | 09/17/2025 | FAA MODIFICATION OF APPROACH LIHTING SYSTEM WITH SEQUENCED FLASHERS II REIMBURSABLE AGREEMENT V85 | CHICAGO DEPARTMENT OF AVIATION | Details |
CITY | 1324098 | Up To $115,973.36 | 04/30/2025 | FAA MDW - FAA SUPPORT FOR RWY 13/31C OVERLAY PROJECT AT CHICAGO MIDWAY INTERNATIONAL AIRPORT REIMBURSABLE AGREEMENT V85 | CHICAGO DEPARTMENT OF AVIATION | Details |