Contract (PO) # | Disclosure # | Award Date | Start Date | End Date | Original Award Amount |
---|---|---|---|---|---|
09/12/2005 | 08/15/2005 | 12/31/2007 | Up To $125,980,337.10 |
Modification # | Description | Disclosure # | Award Date | Start Date | End Date | Amount |
---|---|---|---|---|---|---|
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 05/22/2006 | 08/15/2005 | 12/31/2007 | $1,800,000.00 | ||
952010
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 10/13/2006 | 08/15/2005 | 12/31/2007 | $140,480.00 | |
9520100
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 07/28/2008 | 08/15/2005 | 09/30/2008 | $17,470.00 | |
9520101
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 07/29/2008 | 08/15/2005 | 09/30/2008 | ($4,419.80) | |
9520102
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 08/07/2008 | 08/15/2005 | 09/30/2008 | $450,000.00 | |
9520103
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 08/08/2008 | 08/15/2005 | 09/30/2008 | ($60,000.00) | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 08/08/2008 | 08/15/2005 | 09/30/2008 | ($26,250.00) | ||
9520105
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 09/05/2008 | 08/15/2005 | 09/30/2008 | ($5,112.00) | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 09/19/2008 | 08/15/2005 | 09/30/2008 | $326,045.00 | ||
9520108
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 10/01/2008 | 08/15/2005 | 09/30/2009 | DUR | |
9520109
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 10/08/2008 | 08/15/2005 | 09/30/2009 | ($619,869.00) | |
952011
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 11/03/2006 | 08/15/2005 | 12/31/2007 | $209,179.00 | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 12/04/2008 | 08/15/2005 | 09/30/2009 | $150,000.00 | ||
9520112
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 12/18/2008 | 08/15/2005 | 09/30/2009 | $5,586.00 | |
9520113
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 02/25/2009 | 08/15/2005 | 09/30/2009 | ($1,127,799.63) | |
9520115
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/18/2009 | 08/15/2005 | 09/30/2009 | ($60,085.00) | |
9520117
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/25/2009 | 08/15/2005 | 09/30/2009 | ($168,381.60) | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 04/22/2009 | 08/15/2005 | 09/30/2009 | $23,376.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 04/23/2009 | 08/15/2005 | 09/30/2009 | ($23,721.00) | ||
952012
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 12/06/2006 | 08/15/2005 | 12/31/2007 | ($344,880.00) | |
9520120
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 04/29/2009 | 08/15/2005 | 09/30/2009 | $58,042.25 | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 05/14/2009 | 08/15/2005 | 09/30/2009 | $51,397.00 | ||
9520122
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 05/20/2009 | 08/15/2005 | 09/30/2009 | $20,262.00 | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 06/19/2009 | 08/15/2005 | 09/30/2009 | $54,994.67 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 06/23/2009 | 08/15/2005 | 09/30/2009 | ($3,600.00) | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 11/17/2009 | 08/15/2005 | 09/30/2009 | ($43,554.02) | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 12/28/2009 | 08/15/2005 | 09/30/2009 | $466,481.00 | ||
9520127
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 04/06/2010 | 08/15/2005 | 09/30/2009 | $55,400.00 | |
9520128
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 08/30/2010 | 08/15/2005 | 09/30/2009 | $4,202.90 | |
9520129
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 09/03/2010 | 08/15/2005 | 10/30/2010 | DUR | |
952013
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 12/12/2006 | 08/15/2005 | 12/31/2007 | ($32,250.00) | |
952014
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 12/12/2006 | 08/15/2005 | 12/31/2007 | $64,500.00 | |
952015
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 01/16/2007 | 08/15/2005 | 12/31/2007 | $135,901.40 | |
952016
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/05/2007 | 08/15/2005 | 12/31/2007 | $53,029.99 | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/08/2007 | 08/15/2005 | 12/31/2007 | $115,000.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/12/2007 | 08/15/2005 | 12/31/2007 | $595,000.00 | ||
95202
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 06/07/2006 | 08/15/2005 | 12/31/2007 | ($14,727.50) | |
952020
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/13/2007 | 08/15/2005 | 12/31/2007 | ($139,400.00) | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/15/2007 | 08/15/2005 | 12/31/2007 | $2,488.15 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/19/2007 | 08/15/2005 | 12/31/2007 | $79,131.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/23/2007 | 08/15/2005 | 12/31/2007 | $7,960.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/26/2007 | 08/15/2005 | 12/31/2007 | $34,602.50 | ||
952028
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/27/2007 | 08/15/2005 | 12/31/2007 | ($13,511.00) | |
95203
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 06/26/2006 | 08/15/2005 | 12/31/2007 | $72,377.00 | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/28/2007 | 08/15/2005 | 12/31/2007 | $25,840.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/28/2007 | 08/15/2005 | 12/31/2007 | $13,390.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/29/2007 | 08/15/2005 | 12/31/2007 | $76,200.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/30/2007 | 08/15/2005 | 12/31/2007 | ($32,386.00) | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 04/05/2007 | 08/15/2005 | 12/31/2007 | $2,610,000.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 04/16/2007 | 08/15/2005 | 12/31/2007 | $15,757.00 | ||
952036
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 04/17/2007 | 08/15/2005 | 12/31/2007 | $189,635.00 | |
952037
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 04/20/2007 | 08/15/2005 | 12/31/2007 | ($11,150.00) | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 05/04/2007 | 08/15/2005 | 12/31/2007 | $11,239,190.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 05/16/2007 | 08/15/2005 | 12/31/2007 | $637,144.14 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 05/29/2007 | 08/15/2005 | 12/31/2007 | $494,054.00 | ||
952041
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 06/01/2007 | 08/15/2005 | 12/31/2007 | $232,000.00 | |
952042
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 06/06/2007 | 08/15/2005 | 09/30/2008 | DUR | |
952043
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 06/08/2007 | 08/15/2005 | 09/30/2008 | $796,371.00 | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 06/15/2007 | 08/15/2005 | 09/30/2008 | ($123,581.00) | ||
952046
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 07/03/2007 | 08/15/2005 | 09/30/2008 | ($314,217.00) | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 07/10/2007 | 08/15/2005 | 09/30/2008 | $190,869.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 07/11/2007 | 08/15/2005 | 09/30/2008 | ($210,251.00) | ||
95205
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 07/19/2006 | 08/15/2005 | 12/31/2007 | ($573,259.00) | |
952050
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 07/13/2007 | 08/15/2005 | 09/30/2008 | $900.00 | |
952051
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 07/27/2007 | 08/15/2005 | 09/30/2008 | $1,742,760.00 | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 07/31/2007 | 08/15/2005 | 09/30/2008 | $123,833.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 08/06/2007 | 08/15/2005 | 09/30/2008 | $52,800.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 08/07/2007 | 08/15/2005 | 09/30/2008 | ($46,233.00) | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 08/08/2007 | 08/15/2005 | 09/30/2008 | $979,829.00 | ||
952056
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 08/13/2007 | 08/15/2005 | 09/30/2008 | $503,757.00 | |
952057
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 08/27/2007 | 08/15/2005 | 09/30/2008 | $753,000.00 | |
952058
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 09/24/2007 | 08/15/2005 | 09/30/2008 | ($69,512.00) | |
952059
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 10/17/2007 | 08/15/2005 | 09/30/2008 | $13,375.00 | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 10/25/2007 | 08/15/2005 | 09/30/2008 | $99,000.00 | ||
952062
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 11/09/2007 | 08/15/2005 | 09/30/2008 | ($31,533.00) | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 11/20/2007 | 08/15/2005 | 09/30/2008 | $280,000.00 | ||
952064
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 11/21/2007 | 08/15/2005 | 09/30/2008 | $267,055.00 | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 11/26/2007 | 08/15/2005 | 09/30/2008 | $58,515.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 11/26/2007 | 08/15/2005 | 09/30/2008 | $11,967.00 | ||
952067
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 12/03/2007 | 08/15/2005 | 09/30/2008 | ($103,048.00) | |
952068
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 12/03/2007 | 08/15/2005 | 09/30/2008 | $103,048.00 | |
95207
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 08/24/2006 | 08/15/2005 | 12/31/2007 | ($7,439,849.00) | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 12/12/2007 | 08/15/2005 | 09/30/2008 | $40,386.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 12/28/2007 | 08/15/2005 | 09/30/2008 | $30,202.00 | ||
952073
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 01/08/2008 | 08/15/2005 | 09/30/2008 | ($4,731.00) | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 02/05/2008 | 08/15/2005 | 09/30/2008 | $69,105.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 02/06/2008 | 08/15/2005 | 09/30/2008 | $54,608.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 08/30/2006 | 08/15/2005 | 12/31/2007 | $9,223,190.50 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/17/2008 | 08/15/2005 | 09/30/2008 | $226,455.00 | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/20/2008 | 08/15/2005 | 09/30/2008 | $1,200,000.00 | ||
952082
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/20/2008 | 08/15/2005 | 09/30/2008 | ($1,120,264.50) | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 03/20/2008 | 08/15/2005 | 09/30/2008 | ($254,100.00) | ||
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 04/02/2008 | 08/15/2005 | 09/30/2008 | $60,675.00 | ||
952085
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 04/22/2008 | 08/15/2005 | 09/30/2008 | ($38,388.85) | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 04/25/2008 | 08/15/2005 | 09/30/2008 | ($1,100,000.00) | ||
952089
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 05/23/2008 | 08/15/2005 | 09/30/2008 | ($948,704.00) | |
95209
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 10/02/2006 | 08/15/2005 | 12/31/2007 | $171,315.80 | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 05/28/2008 | 08/15/2005 | 09/30/2008 | $2,026.00 | ||
952092
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 05/29/2008 | 08/15/2005 | 09/30/2008 | ($60,950.00) | |
O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 06/13/2008 | 08/15/2005 | 09/30/2008 | $36,500.00 | ||
952095
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 06/27/2008 | 08/15/2005 | 09/30/2008 | ($13,150.00) | |
952097
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 07/15/2008 | 08/15/2005 | 09/30/2008 | ($165,500.00) | |
952099
| O'HARE MODERNIZATION PROGRAM RUNWAY 9L-27R SITE PREPARATION | 07/23/2008 | 08/15/2005 | 09/30/2008 | ($136,919.80) |