Contract (PO) # Disclosure # Award Date Start Date End Date Department Original Award Amount
06/01/2011 OHARE MODERNIZATION PROJECT $160,482,516.40

Modifications/Amendments

Modification # Description Disclosure # Award Date Start Date End Date Department Amount
246401
RUNWAY 10C-28C CENTER 08/10/2011 OHARE MODERNIZATION PROJECT $226,012.00
2464010
RUNWAY 10C-28C CENTER 11/01/2011 OHARE MODERNIZATION PROJECT ($13,740.00)
RUNWAY 10C-28C CENTER 05/22/2013 OHARE MODERNIZATION PROJECT $150,000.00
RUNWAY 10C-28C CENTER 06/05/2013 OHARE MODERNIZATION PROJECT $185,000.00
24640102
RUNWAY 10C-28C CENTER 06/10/2013 OHARE MODERNIZATION PROJECT ($100,000.00)
24640103
RUNWAY 10C-28C CENTER 06/14/2013 OHARE MODERNIZATION PROJECT $45,000.00
24640104
RUNWAY 10C-28C CENTER 07/03/2013 OHARE MODERNIZATION PROJECT $551,893.10
24640105
RUNWAY 10C-28C CENTER 07/09/2013 OHARE MODERNIZATION PROJECT ($900,000.00)
24640106
RUNWAY 10C-28C CENTER 07/09/2013 OHARE MODERNIZATION PROJECT ($565,500.00)
24640107
RUNWAY 10C-28C CENTER 07/11/2013 OHARE MODERNIZATION PROJECT $7,000.00
24640108
RUNWAY 10C-28C CENTER 07/12/2013 OHARE MODERNIZATION PROJECT ($31,950.00)
24640109
RUNWAY 10C-28C CENTER 07/18/2013 OHARE MODERNIZATION PROJECT $414,995.80
2464011
RUNWAY 10C-28C CENTER 11/29/2011 OHARE MODERNIZATION PROJECT $8,790.00
24640110
RUNWAY 10C-28C CENTER 07/24/2013 OHARE MODERNIZATION PROJECT ($116,660.00)
24640111
RUNWAY 10C-28C CENTER 07/31/2013 OHARE MODERNIZATION PROJECT $151,625.20
RUNWAY 10C-28C CENTER 08/01/2013 OHARE MODERNIZATION PROJECT $21,313.00
24640113
RUNWAY 10C-28C CENTER 08/05/2013 OHARE MODERNIZATION PROJECT $620,015.40
24640114
RUNWAY 10C-28C CENTER 08/07/2013 OHARE MODERNIZATION PROJECT ($643,925.40)
RUNWAY 10C-28C CENTER 08/09/2013 OHARE MODERNIZATION PROJECT $252,000.00
24640116
RUNWAY 10C-28C CENTER 08/14/2013 OHARE MODERNIZATION PROJECT $90,000.00
24640117
RUNWAY 10C-28C CENTER 08/16/2013 OHARE MODERNIZATION PROJECT $15,150.00
24640118
RUNWAY 10C-28C CENTER 08/20/2013 OHARE MODERNIZATION PROJECT ($189,000.00)
24640119
RUNWAY 10C-28C CENTER 08/21/2013 OHARE MODERNIZATION PROJECT $214,483.00
2464012
RUNWAY 10C-28C CENTER 12/05/2011 OHARE MODERNIZATION PROJECT $355,000.00
24640120
RUNWAY 10C-28C CENTER 08/22/2013 OHARE MODERNIZATION PROJECT ($187,512.00)
RUNWAY 10C-28C CENTER 08/23/2013 OHARE MODERNIZATION PROJECT $97,390.00
24640122
RUNWAY 10C-28C CENTER 08/28/2013 OHARE MODERNIZATION PROJECT $70,750.00
RUNWAY 10C-28C CENTER 08/28/2013 OHARE MODERNIZATION PROJECT $133,719.00
24640124
RUNWAY 10C-28C CENTER 08/29/2013 OHARE MODERNIZATION PROJECT $15,000.00
RUNWAY 10C-28C CENTER 09/06/2013 OHARE MODERNIZATION PROJECT $39,361.00
RUNWAY 10C-28C CENTER 09/23/2013 OHARE MODERNIZATION PROJECT $35,000.00
RUNWAY 10C-28C CENTER 09/26/2013 OHARE MODERNIZATION PROJECT $230,066.68
2464013
RUNWAY 10C-28C CENTER 12/12/2011 OHARE MODERNIZATION PROJECT $363,610.00
24640130
RUNWAY 10C-28C CENTER 09/27/2013 OHARE MODERNIZATION PROJECT $275,306.70
24640131
RUNWAY 10C-28C CENTER 09/30/2013 OHARE MODERNIZATION PROJECT ($277,000.00)
RUNWAY 10C-28C CENTER 10/01/2013 OHARE MODERNIZATION PROJECT $50,521.00
24640133
RUNWAY 10C-28C CENTER 10/08/2013 OHARE MODERNIZATION PROJECT $346,500.00
24640134
RUNWAY 10C-28C CENTER 10/16/2013 OHARE MODERNIZATION PROJECT $87,017.50
24640135
RUNWAY 10C-28C CENTER 10/21/2013 OHARE MODERNIZATION PROJECT ($348,510.34)
24640136
RUNWAY 10C-28C CENTER 10/24/2013 OHARE MODERNIZATION PROJECT ($90,000.00)
RUNWAY 10C-28C CENTER 11/04/2013 OHARE MODERNIZATION PROJECT $73,500.00
RUNWAY 10C-28C CENTER 11/12/2013 OHARE MODERNIZATION PROJECT $175,669.80
RUNWAY 10C-28C CENTER 11/14/2013 OHARE MODERNIZATION PROJECT $488,426.23
2464014
RUNWAY 10C-28C CENTER 12/14/2011 OHARE MODERNIZATION PROJECT ($2,556,940.00)
RUNWAY 10C-28C CENTER 11/18/2013 OHARE MODERNIZATION PROJECT $34,233.00
RUNWAY 10C-28C CENTER 11/25/2013 OHARE MODERNIZATION PROJECT $12,629.20
RUNWAY 10C-28C CENTER 11/29/2013 OHARE MODERNIZATION PROJECT $135,584.00
RUNWAY 10C-28C CENTER 12/02/2013 OHARE MODERNIZATION PROJECT $1,447.27
RUNWAY 10C-28C CENTER 12/02/2013 OHARE MODERNIZATION PROJECT $6,255.81
RUNWAY 10C-28C CENTER 12/03/2013 OHARE MODERNIZATION PROJECT $257,695.00
RUNWAY 10C-28C CENTER 12/04/2013 OHARE MODERNIZATION PROJECT $3,021.98
RUNWAY 10C-28C CENTER 12/04/2013 OHARE MODERNIZATION PROJECT $17,468.00
RUNWAY 10C-28C CENTER 12/04/2013 OHARE MODERNIZATION PROJECT $65,000.00
24640149
RUNWAY 10C-28C CENTER 12/05/2013 OHARE MODERNIZATION PROJECT $574,977.99
RUNWAY 10C-28C CENTER 01/06/2012 OHARE MODERNIZATION PROJECT $50,669.00
24640150
RUNWAY 10C-28C CENTER 12/05/2013 OHARE MODERNIZATION PROJECT ($618,675.00)
24640151
RUNWAY 10C-28C CENTER 12/06/2013 OHARE MODERNIZATION PROJECT ($378,955.30)
RUNWAY 10C-28C CENTER 12/13/2013 OHARE MODERNIZATION PROJECT $138,179.95
RUNWAY 10C-28C CENTER 12/13/2013 OHARE MODERNIZATION PROJECT $32,485.02
24640154
RUNWAY 10C-28C CENTER 12/20/2013 OHARE MODERNIZATION PROJECT $392,375.62
24640155
RUNWAY 10C-28C CENTER 12/20/2013 OHARE MODERNIZATION PROJECT ($415,333.44)
RUNWAY 10C-28C CENTER 12/23/2013 OHARE MODERNIZATION PROJECT $68,798.43
RUNWAY 10C-28C CENTER 01/08/2014 OHARE MODERNIZATION PROJECT $337,348.24
RUNWAY 10C-28C CENTER 01/13/2014 OHARE MODERNIZATION PROJECT $30,240.00
RUNWAY 10C-28C CENTER 03/26/2014 OHARE MODERNIZATION PROJECT $38,958.46
2464016
RUNWAY 10C-28C CENTER 01/31/2012 OHARE MODERNIZATION PROJECT $31,364.25
RUNWAY 10C-28C CENTER 04/04/2014 OHARE MODERNIZATION PROJECT $80,000.00
24640161
RUNWAY 10C-28C CENTER 04/10/2014 OHARE MODERNIZATION PROJECT ($1,098,353.44)
RUNWAY 10C-28C CENTER 04/30/2014 OHARE MODERNIZATION PROJECT $713,862.96
RUNWAY 10C-28C CENTER 05/22/2014 OHARE MODERNIZATION PROJECT $88,996.00
24640164
RUNWAY 10C-28C CENTER 06/09/2014 OHARE MODERNIZATION PROJECT $477,388.65
24640165
RUNWAY 10C-28C CENTER 06/30/2014 OHARE MODERNIZATION PROJECT ($1,893,542.67)
RUNWAY 10C-28C CENTER 07/23/2014 OHARE MODERNIZATION PROJECT ($5,900.00)
RUNWAY 10C-28C CENTER 07/28/2014 OHARE MODERNIZATION PROJECT ($13,457.20)
RUNWAY 10C-28C CENTER 08/20/2014 OHARE MODERNIZATION PROJECT $27,000.00
RUNWAY 10C-28C CENTER 08/26/2014 OHARE MODERNIZATION PROJECT $26,261.55
24640171
RUNWAY 10C-28C CENTER 10/08/2014 OHARE MODERNIZATION PROJECT ($93,654.18)
RUNWAY 10C-28C CENTER 11/05/2014 OHARE MODERNIZATION PROJECT $195,000.00
24640173
RUNWAY 10C-28C CENTER 05/15/2015 OHARE MODERNIZATION PROJECT ($8,438.10)
24640174
RUNWAY 10C-28C CENTER 05/20/2015 OHARE MODERNIZATION PROJECT ($2,324.20)
24640175
RUNWAY 10C-28C CENTER 05/21/2015 OHARE MODERNIZATION PROJECT ($9,885.47)
24640177
RUNWAY 10C-28C CENTER 03/30/2021 OHARE MODERNIZATION PROJECT ($309,910.52)
2464018
RUNWAY 10C-28C CENTER 02/08/2012 OHARE MODERNIZATION PROJECT $1,780,120.00
2464019
RUNWAY 10C-28C CENTER 02/10/2012 OHARE MODERNIZATION PROJECT ($11,020.00)
246402
RUNWAY 10C-28C CENTER 08/10/2011 OHARE MODERNIZATION PROJECT $352,792.41
2464020
RUNWAY 10C-28C CENTER 02/15/2012 OHARE MODERNIZATION PROJECT $500,000.00
RUNWAY 10C-28C CENTER 02/16/2012 OHARE MODERNIZATION PROJECT ($500,000.00)
2464022
RUNWAY 10C-28C CENTER 02/24/2012 OHARE MODERNIZATION PROJECT $332,000.00
2464023
RUNWAY 10C-28C CENTER 02/28/2012 OHARE MODERNIZATION PROJECT ($164,122.00)
RUNWAY 10C-28C CENTER 03/12/2012 OHARE MODERNIZATION PROJECT ($200,000.00)
2464025
RUNWAY 10C-28C CENTER 03/13/2012 OHARE MODERNIZATION PROJECT $2,240.00
2464026
RUNWAY 10C-28C CENTER 03/14/2012 OHARE MODERNIZATION PROJECT ($72,920.00)
RUNWAY 10C-28C CENTER 04/10/2012 OHARE MODERNIZATION PROJECT $200,000.00
2464028
RUNWAY 10C-28C CENTER 04/19/2012 OHARE MODERNIZATION PROJECT $1,006,574.90
2464029
RUNWAY 10C-28C CENTER 04/24/2012 OHARE MODERNIZATION PROJECT $22,442.70
246403
RUNWAY 10C-28C CENTER 08/10/2011 OHARE MODERNIZATION PROJECT ($425,097.80)
RUNWAY 10C-28C CENTER 04/27/2012 OHARE MODERNIZATION PROJECT $22,500.00
RUNWAY 10C-28C CENTER 05/04/2012 OHARE MODERNIZATION PROJECT $55,000.00
RUNWAY 10C-28C CENTER 05/08/2012 OHARE MODERNIZATION PROJECT $27,283.00
RUNWAY 10C-28C CENTER 05/10/2012 OHARE MODERNIZATION PROJECT $38,250.00
RUNWAY 10C-28C CENTER 05/16/2012 OHARE MODERNIZATION PROJECT $55,000.00
RUNWAY 10C-28C CENTER 05/23/2012 OHARE MODERNIZATION PROJECT $5,800.00
2464036
RUNWAY 10C-28C CENTER 05/30/2012 OHARE MODERNIZATION PROJECT ($750,000.00)
RUNWAY 10C-28C CENTER 05/31/2012 OHARE MODERNIZATION PROJECT $750,000.00
2464038
RUNWAY 10C-28C CENTER 06/04/2012 OHARE MODERNIZATION PROJECT $3,200.00
RUNWAY 10C-28C CENTER 06/11/2012 OHARE MODERNIZATION PROJECT $175,000.00
246404
RUNWAY 10C-28C CENTER 09/16/2011 OHARE MODERNIZATION PROJECT $7,900.00
2464040
RUNWAY 10C-28C CENTER 06/15/2012 OHARE MODERNIZATION PROJECT $403,267.00
RUNWAY 10C-28C CENTER 06/25/2012 OHARE MODERNIZATION PROJECT $400,000.00
2464042
RUNWAY 10C-28C CENTER 07/03/2012 OHARE MODERNIZATION PROJECT $2,759,713.14
RUNWAY 10C-28C CENTER 07/09/2012 OHARE MODERNIZATION PROJECT $60,529.00
RUNWAY 10C-28C CENTER 07/11/2012 OHARE MODERNIZATION PROJECT $282,644.00
2464045
RUNWAY 10C-28C CENTER 07/30/2012 OHARE MODERNIZATION PROJECT $36,614.32
2464046
RUNWAY 10C-28C CENTER 08/06/2012 OHARE MODERNIZATION PROJECT ($46,000.00)
RUNWAY 10C-28C CENTER 08/08/2012 OHARE MODERNIZATION PROJECT ($400,000.00)
2464048
RUNWAY 10C-28C CENTER 08/20/2012 OHARE MODERNIZATION PROJECT $90,000.00
RUNWAY 10C-28C CENTER 08/22/2012 OHARE MODERNIZATION PROJECT ($165,000.00)
246405
RUNWAY 10C-28C CENTER 09/27/2011 OHARE MODERNIZATION PROJECT $36,818.00
2464050
RUNWAY 10C-28C CENTER 08/29/2012 OHARE MODERNIZATION PROJECT ($8,265.00)
2464051
RUNWAY 10C-28C CENTER 09/07/2012 OHARE MODERNIZATION PROJECT $9,711.00
RUNWAY 10C-28C CENTER 09/12/2012 OHARE MODERNIZATION PROJECT $100,000.00
RUNWAY 10C-28C CENTER 09/17/2012 OHARE MODERNIZATION PROJECT ($100,000.00)
2464054
RUNWAY 10C-28C CENTER 09/19/2012 OHARE MODERNIZATION PROJECT $332,500.00
2464055
RUNWAY 10C-28C CENTER 09/25/2012 OHARE MODERNIZATION PROJECT ($8,307.00)
RUNWAY 10C-28C CENTER 09/27/2012 OHARE MODERNIZATION PROJECT $108,530.00
RUNWAY 10C-28C CENTER 10/02/2012 OHARE MODERNIZATION PROJECT $189,806.00
RUNWAY 10C-28C CENTER 10/05/2012 OHARE MODERNIZATION PROJECT ($24,771.00)
RUNWAY 10C-28C CENTER 10/25/2012 OHARE MODERNIZATION PROJECT $52,979.08
246406
RUNWAY 10C-28C CENTER 09/29/2011 OHARE MODERNIZATION PROJECT ($79,260.32)
2464060
RUNWAY 10C-28C CENTER 10/26/2012 OHARE MODERNIZATION PROJECT ($33,250.00)
RUNWAY 10C-28C CENTER 11/05/2012 OHARE MODERNIZATION PROJECT $593,094.00
2464062
RUNWAY 10C-28C CENTER 11/09/2012 OHARE MODERNIZATION PROJECT $1,680.00
2464063
RUNWAY 10C-28C CENTER 11/13/2012 OHARE MODERNIZATION PROJECT ($644.62)
2464064
RUNWAY 10C-28C CENTER 11/14/2012 OHARE MODERNIZATION PROJECT $15,298.82
2464065
RUNWAY 10C-28C CENTER 11/15/2012 OHARE MODERNIZATION PROJECT ($28,103.00)
2464066
RUNWAY 10C-28C CENTER 11/23/2012 OHARE MODERNIZATION PROJECT $2,100.00
2464067
RUNWAY 10C-28C CENTER 11/28/2012 OHARE MODERNIZATION PROJECT ($160,000.00)
2464068
RUNWAY 10C-28C CENTER 12/04/2012 OHARE MODERNIZATION PROJECT $7,020.00
2464069
RUNWAY 10C-28C CENTER 12/05/2012 OHARE MODERNIZATION PROJECT ($630.00)
246407
RUNWAY 10C-28C CENTER 10/19/2011 OHARE MODERNIZATION PROJECT ($11,746.60)
2464070
RUNWAY 10C-28C CENTER 12/07/2012 OHARE MODERNIZATION PROJECT $44,038.00
2464071
RUNWAY 10C-28C CENTER 12/12/2012 OHARE MODERNIZATION PROJECT $91,000.00
2464072
RUNWAY 10C-28C CENTER 12/12/2012 OHARE MODERNIZATION PROJECT ($37,332.00)
2464073
RUNWAY 10C-28C CENTER 12/17/2012 OHARE MODERNIZATION PROJECT $302,500.00
2464074
RUNWAY 10C-28C CENTER 12/19/2012 OHARE MODERNIZATION PROJECT ($495,000.00)
2464075
RUNWAY 10C-28C CENTER 12/26/2012 OHARE MODERNIZATION PROJECT $8,725.00
2464076
RUNWAY 10C-28C CENTER 12/28/2012 OHARE MODERNIZATION PROJECT $23,847.26
2464077
RUNWAY 10C-28C CENTER 01/08/2013 OHARE MODERNIZATION PROJECT ($30,000.00)
2464078
RUNWAY 10C-28C CENTER 01/08/2013 OHARE MODERNIZATION PROJECT $15,418.55
2464079
RUNWAY 10C-28C CENTER 01/09/2013 OHARE MODERNIZATION PROJECT ($30,419.70)
246408
RUNWAY 10C-28C CENTER 10/24/2011 OHARE MODERNIZATION PROJECT ($11,773.50)
RUNWAY 10C-28C CENTER 01/10/2013 OHARE MODERNIZATION PROJECT $33,000.00
RUNWAY 10C-28C CENTER 01/11/2013 OHARE MODERNIZATION PROJECT $5,000.00
RUNWAY 10C-28C CENTER 01/16/2013 OHARE MODERNIZATION PROJECT $219,000.00
RUNWAY 10C-28C CENTER 01/24/2013 OHARE MODERNIZATION PROJECT $800,000.00
RUNWAY 10C-28C CENTER 01/28/2013 OHARE MODERNIZATION PROJECT $504,000.00
RUNWAY 10C-28C CENTER 01/30/2013 OHARE MODERNIZATION PROJECT $900,000.00
RUNWAY 10C-28C CENTER 02/06/2013 OHARE MODERNIZATION PROJECT $260,226.00
RUNWAY 10C-28C CENTER 02/07/2013 OHARE MODERNIZATION PROJECT ($68,825.00)
RUNWAY 10C-28C CENTER 02/20/2013 OHARE MODERNIZATION PROJECT $35,551.00
RUNWAY 10C-28C CENTER 03/08/2013 OHARE MODERNIZATION PROJECT $505,000.00
246409
RUNWAY 10C-28C CENTER 10/31/2011 OHARE MODERNIZATION PROJECT $133,200.00
RUNWAY 10C-28C CENTER 03/26/2013 OHARE MODERNIZATION PROJECT ($3,074.96)
2464091
RUNWAY 10C-28C CENTER 03/27/2013 OHARE MODERNIZATION PROJECT $2,750.00
RUNWAY 10C-28C CENTER 03/28/2013 OHARE MODERNIZATION PROJECT ($600,000.00)
RUNWAY 10C-28C CENTER 04/02/2013 OHARE MODERNIZATION PROJECT $80,000.00
2464094
RUNWAY 10C-28C CENTER 04/10/2013 OHARE MODERNIZATION PROJECT ($44,490.00)
2464095
RUNWAY 10C-28C CENTER 04/19/2013 OHARE MODERNIZATION PROJECT ($300,000.00)
2464096
RUNWAY 10C-28C CENTER 04/25/2013 OHARE MODERNIZATION PROJECT ($6,750.00)
2464097
RUNWAY 10C-28C CENTER 04/29/2013 OHARE MODERNIZATION PROJECT ($422,440.00)
RUNWAY 10C-28C CENTER 05/13/2013 OHARE MODERNIZATION PROJECT $1,000,000.00
2464099
RUNWAY 10C-28C CENTER 05/14/2013 OHARE MODERNIZATION PROJECT $424,680.90