Modification # | Description | Disclosure # | Award Date | Start Date | End Date | Department | Amount |
---|---|---|---|---|---|---|---|
1290331
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 08/05/2020 | OHARE MODERNIZATION PROJECT | $27,265.54 | |||
12903310
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 11/04/2020 | OHARE MODERNIZATION PROJECT | ($70.28) | |||
129033100
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/30/2022 | OHARE MODERNIZATION PROJECT | $86,231.38 | |||
129033101
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/31/2022 | OHARE MODERNIZATION PROJECT | ($197,476.61) | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/12/2022 | O'HARE MODERNIZATION PROGRAM | $375,709.45 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/12/2022 | O'HARE MODERNIZATION PROGRAM | $474,100.00 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/16/2022 | O'HARE MODERNIZATION PROGRAM | $1,529,121.65 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/16/2022 | O'HARE MODERNIZATION PROGRAM | $11,591.04 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/17/2022 | O'HARE MODERNIZATION PROGRAM | $1,719,601.35 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/17/2022 | O'HARE MODERNIZATION PROGRAM | $211,571.15 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/17/2022 | O'HARE MODERNIZATION PROGRAM | $194,965.84 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 11/18/2020 | OHARE MODERNIZATION PROJECT | $404,446.86 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/18/2022 | O'HARE MODERNIZATION PROGRAM | $155,416.43 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/18/2022 | O'HARE MODERNIZATION PROGRAM | $47,142.36 | ||||
129033114
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/25/2022 | O'HARE MODERNIZATION PROGRAM | $66,842.60 | |||
129033115
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/26/2022 | O'HARE MODERNIZATION PROGRAM | $35,455.64 | |||
129033116
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 07/12/2022 | O'HARE MODERNIZATION PROGRAM | ($18,091.50) | |||
129033117
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 07/13/2022 | O'HARE MODERNIZATION PROGRAM | $1,417.80 | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 07/22/2022 | O'HARE MODERNIZATION PROGRAM | $878,764.00 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 07/25/2022 | O'HARE MODERNIZATION PROGRAM | $632,796.63 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 07/28/2022 | O'HARE MODERNIZATION PROGRAM | $35,094.49 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 07/29/2022 | O'HARE MODERNIZATION PROGRAM | $496,790.32 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 08/02/2022 | O'HARE MODERNIZATION PROGRAM | $36,799.40 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 08/03/2022 | O'HARE MODERNIZATION PROGRAM | $4,454.42 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 08/04/2022 | O'HARE MODERNIZATION PROGRAM | ($90,785.39) | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 08/04/2022 | O'HARE MODERNIZATION PROGRAM | ($9,651.34) | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 08/26/2022 | O'HARE MODERNIZATION PROGRAM | $44,640.69 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 10/13/2022 | O'HARE MODERNIZATION PROGRAM | $355,770.38 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 10/21/2022 | O'HARE MODERNIZATION PROGRAM | $107,870.46 | ||||
129033129
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 10/24/2022 | O'HARE MODERNIZATION PROGRAM | $213,279.73 | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 11/18/2020 | OHARE MODERNIZATION PROJECT | $29,000.00 | ||||
129033130
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 10/25/2022 | O'HARE MODERNIZATION PROGRAM | $66,586.00 | |||
129033131
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 11/04/2022 | O'HARE MODERNIZATION PROGRAM | ($46,154.26) | |||
129033132
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 11/08/2022 | O'HARE MODERNIZATION PROGRAM | ($1,107,819.25) | |||
129033133
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 11/21/2022 | O'HARE MODERNIZATION PROGRAM | $297,257.86 | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 11/22/2022 | O'HARE MODERNIZATION PROGRAM | $62,561.80 | ||||
129033135
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 11/23/2022 | O'HARE MODERNIZATION PROGRAM | ($1,612,229.43) | |||
129033136
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 12/01/2022 | O'HARE MODERNIZATION PROGRAM | ($913,502.18) | |||
129033137
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 12/13/2022 | O'HARE MODERNIZATION PROGRAM | $1,929,034.53 | |||
129033138
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 12/27/2022 | O'HARE MODERNIZATION PROGRAM | $43,513.41 | |||
129033139
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 12/30/2022 | O'HARE MODERNIZATION PROGRAM | $562,344.34 | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 11/18/2020 | OHARE MODERNIZATION PROJECT | $406,645.20 | ||||
129033141
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 01/23/2023 | O'HARE MODERNIZATION PROGRAM | $1,210.00 | |||
129033142
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/07/2023 | O'HARE MODERNIZATION PROGRAM | $34,850.17 | |||
129033143
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/08/2023 | O'HARE MODERNIZATION PROGRAM | $91,658.42 | |||
129033144
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/08/2023 | O'HARE MODERNIZATION PROGRAM | $5,644,677.81 | |||
129033145
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/15/2023 | O'HARE MODERNIZATION PROGRAM | $453,949.21 | |||
129033146
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/16/2023 | O'HARE MODERNIZATION PROGRAM | $10,488.55 | |||
129033147
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/16/2023 | O'HARE MODERNIZATION PROGRAM | $35,479.25 | |||
129033148
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/22/2023 | O'HARE MODERNIZATION PROGRAM | $248,028.75 | |||
129033149
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/22/2023 | O'HARE MODERNIZATION PROGRAM | $1,135,878.00 | |||
129033150
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/22/2023 | O'HARE MODERNIZATION PROGRAM | $56,943.64 | |||
129033151
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/22/2023 | O'HARE MODERNIZATION PROGRAM | $81,942.35 | |||
129033152
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/23/2023 | O'HARE MODERNIZATION PROGRAM | $416,280.35 | |||
129033153
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/28/2023 | O'HARE MODERNIZATION PROGRAM | $11,707.75 | |||
129033154
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/29/2023 | O'HARE MODERNIZATION PROGRAM | $22,001.78 | |||
129033155
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 04/20/2023 | O'HARE MODERNIZATION PROGRAM | $99,855.86 | |||
129033156
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 04/21/2023 | O'HARE MODERNIZATION PROGRAM | $34,368.69 | |||
129033157
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 04/25/2023 | O'HARE MODERNIZATION PROGRAM | $186,795.96 | |||
129033158
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/01/2023 | O'HARE MODERNIZATION PROGRAM | $117,134.09 | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 12/09/2020 | OHARE MODERNIZATION PROJECT | $210,290.21 | ||||
129033160
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/09/2023 | O'HARE MODERNIZATION PROGRAM | $24,740.17 | |||
129033161
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/12/2023 | O'HARE MODERNIZATION PROGRAM | $93,621.35 | |||
129033162
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 06/12/2023 | O'HARE MODERNIZATION PROGRAM | ($64,501.92) | |||
129033163
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 06/20/2023 | O'HARE MODERNIZATION PROGRAM | $1,135,878.00 | |||
129033164
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 09/20/2023 | O'HARE MODERNIZATION PROGRAM | $59,676.65 | |||
129033165
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 09/21/2023 | O'HARE MODERNIZATION PROGRAM | $87,429.96 | |||
129033166
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 10/03/2023 | O'HARE MODERNIZATION PROGRAM | $113,772.76 | |||
129033167
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 12/22/2023 | O'HARE MODERNIZATION PROGRAM | $113,179.98 | |||
129033168
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 12/22/2023 | O'HARE MODERNIZATION PROGRAM | $340,813.40 | |||
129033169
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/09/2024 | O'HARE MODERNIZATION PROGRAM | $84,488.61 | |||
12903317
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 12/18/2020 | OHARE MODERNIZATION PROJECT | $93,140.68 | |||
129033170
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/26/2024 | O'HARE MODERNIZATION PROGRAM | $33,092.66 | |||
129033171
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/01/2024 | O'HARE MODERNIZATION PROGRAM | $10,352,271.23 | |||
129033172
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/06/2024 | O'HARE MODERNIZATION PROGRAM | ($2,547,839.34) | |||
129033173
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/06/2024 | O'HARE MODERNIZATION PROGRAM | ($161,801.98) | |||
129033174
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 04/29/2024 | O'HARE MODERNIZATION PROGRAM | ($1,570,546.78) | |||
129033175
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/09/2024 | O'HARE MODERNIZATION PROGRAM | $619,416.00 | |||
129033176
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/20/2024 | O'HARE MODERNIZATION PROGRAM | $993,240.29 | |||
129033178
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 08/20/2024 | O'HARE MODERNIZATION PROGRAM | ($10,613.68) | |||
129033179
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 09/13/2024 | O'HARE MODERNIZATION PROGRAM | $3,663,749.78 | |||
12903318
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 01/27/2021 | OHARE MODERNIZATION PROJECT | $5,407.66 | |||
12903319
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 01/27/2021 | OHARE MODERNIZATION PROJECT | ($21,993.44) | |||
1290332
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 08/05/2020 | OHARE MODERNIZATION PROJECT | $111,010.04 | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/03/2021 | OHARE MODERNIZATION PROJECT | $860,000.00 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/10/2021 | OHARE MODERNIZATION PROJECT | $107,000.00 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/10/2021 | OHARE MODERNIZATION PROJECT | $87,124.56 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/10/2021 | OHARE MODERNIZATION PROJECT | $30,000.00 | ||||
12903325
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/19/2021 | OHARE MODERNIZATION PROJECT | $224,781.40 | |||
12903326
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/26/2021 | OHARE MODERNIZATION PROJECT | $443,953.21 | |||
12903327
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/31/2021 | OHARE MODERNIZATION PROJECT | ($399,667.62) | |||
12903328
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 04/07/2021 | OHARE MODERNIZATION PROJECT | $83,049.17 | |||
12903329
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 04/07/2021 | OHARE MODERNIZATION PROJECT | ($3,571.68) | |||
1290333
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 09/08/2020 | OHARE MODERNIZATION PROJECT | $378,884.19 | |||
12903330
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/07/2021 | OHARE MODERNIZATION PROJECT | ($992,886.72) | |||
12903331
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/07/2021 | OHARE MODERNIZATION PROJECT | $193,885.98 | |||
12903333
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/07/2021 | OHARE MODERNIZATION PROJECT | $119,000.00 | |||
12903334
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 05/14/2021 | OHARE MODERNIZATION PROJECT | $111,650.44 | |||
12903335
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 06/01/2021 | OHARE MODERNIZATION PROJECT | $250,846.40 | |||
12903336
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 06/02/2021 | OHARE MODERNIZATION PROJECT | $90,880.00 | |||
12903337
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 06/02/2021 | OHARE MODERNIZATION PROJECT | $285,022.68 | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 06/21/2021 | OHARE MODERNIZATION PROJECT | $1,170,000.00 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 06/22/2021 | OHARE MODERNIZATION PROJECT | $713,457.33 | ||||
1290334
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 09/09/2020 | OHARE MODERNIZATION PROJECT | ($185,878.26) | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 06/23/2021 | OHARE MODERNIZATION PROJECT | ($603,802.32) | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 06/23/2021 | OHARE MODERNIZATION PROJECT | $154,335.37 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 06/25/2021 | OHARE MODERNIZATION PROJECT | ($85,656.71) | ||||
12903343
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 06/30/2021 | OHARE MODERNIZATION PROJECT | $14,495.18 | |||
12903344
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 07/08/2021 | OHARE MODERNIZATION PROJECT | $620,800.55 | |||
12903345
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 07/09/2021 | OHARE MODERNIZATION PROJECT | $8,701.10 | |||
12903346
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 07/16/2021 | OHARE MODERNIZATION PROJECT | $3,135,141.63 | |||
12903347
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 07/16/2021 | OHARE MODERNIZATION PROJECT | $382,717.73 | |||
12903348
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 07/20/2021 | OHARE MODERNIZATION PROJECT | ($153,048.23) | |||
12903349
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 07/22/2021 | OHARE MODERNIZATION PROJECT | $2,830,362.35 | |||
1290335
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 09/17/2020 | OHARE MODERNIZATION PROJECT | ($407,310.61) | |||
12903350
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 08/04/2021 | OHARE MODERNIZATION PROJECT | $361,356.00 | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 08/05/2021 | OHARE MODERNIZATION PROJECT | $32,611.03 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 08/05/2021 | OHARE MODERNIZATION PROJECT | $218,857.83 | ||||
12903353
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 08/12/2021 | OHARE MODERNIZATION PROJECT | $30,371.84 | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 08/26/2021 | OHARE MODERNIZATION PROJECT | $723,800.00 | ||||
12903355
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 08/27/2021 | OHARE MODERNIZATION PROJECT | $194,309.77 | |||
12903356
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 08/27/2021 | OHARE MODERNIZATION PROJECT | $64,853.40 | |||
12903357
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 09/01/2021 | OHARE MODERNIZATION PROJECT | $51,768.44 | |||
12903358
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 09/02/2021 | OHARE MODERNIZATION PROJECT | $117,513.10 | |||
12903359
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 09/02/2021 | OHARE MODERNIZATION PROJECT | $97,440.10 | |||
1290336
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 09/18/2020 | OHARE MODERNIZATION PROJECT | ($547,085.75) | |||
12903360
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 09/07/2021 | OHARE MODERNIZATION PROJECT | ($24,049.08) | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 09/09/2021 | OHARE MODERNIZATION PROJECT | $497,000.00 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 09/22/2021 | OHARE MODERNIZATION PROJECT | $301,519.75 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 09/22/2021 | OHARE MODERNIZATION PROJECT | $713,000.00 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 09/23/2021 | OHARE MODERNIZATION PROJECT | $530,102.99 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 09/27/2021 | OHARE MODERNIZATION PROJECT | $72,153.90 | ||||
12903367
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 10/04/2021 | OHARE MODERNIZATION PROJECT | $147,812.40 | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 10/07/2021 | OHARE MODERNIZATION PROJECT | $130,821.69 | ||||
12903369
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 10/08/2021 | OHARE MODERNIZATION PROJECT | ($22,869.15) | |||
1290337
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 10/21/2020 | OHARE MODERNIZATION PROJECT | $279,381.90 | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 10/18/2021 | OHARE MODERNIZATION PROJECT | $300,000.00 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 10/19/2021 | OHARE MODERNIZATION PROJECT | $137,031.33 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 10/19/2021 | OHARE MODERNIZATION PROJECT | $419,616.88 | ||||
12903373
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 10/21/2021 | OHARE MODERNIZATION PROJECT | $720,715.57 | |||
12903374
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 10/22/2021 | OHARE MODERNIZATION PROJECT | $57,520.12 | |||
12903375
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 10/22/2021 | OHARE MODERNIZATION PROJECT | $2,349.04 | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 11/12/2021 | OHARE MODERNIZATION PROJECT | $1,123,000.00 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 11/18/2021 | OHARE MODERNIZATION PROJECT | $1,900,000.00 | ||||
12903378
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 01/18/2022 | OHARE MODERNIZATION PROJECT | $303,000.00 | |||
12903379
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 01/18/2022 | OHARE MODERNIZATION PROJECT | $2,660.00 | |||
1290338
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 11/04/2020 | OHARE MODERNIZATION PROJECT | $139,415.27 | |||
12903380
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 01/18/2022 | OHARE MODERNIZATION PROJECT | $11,546.67 | |||
12903381
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 01/28/2022 | OHARE MODERNIZATION PROJECT | ($372,791.52) | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/10/2022 | OHARE MODERNIZATION PROJECT | $6,095.65 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/10/2022 | OHARE MODERNIZATION PROJECT | $6,095.64 | ||||
12903384
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/15/2022 | OHARE MODERNIZATION PROJECT | $1,000,000.00 | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/15/2022 | OHARE MODERNIZATION PROJECT | $542,708.33 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/15/2022 | OHARE MODERNIZATION PROJECT | $339,108.24 | ||||
12903387
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/15/2022 | OHARE MODERNIZATION PROJECT | $36,498.55 | |||
12903388
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/25/2022 | OHARE MODERNIZATION PROJECT | $53,193.74 | |||
12903389
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/25/2022 | OHARE MODERNIZATION PROJECT | $4,408.14 | |||
1290339
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 11/04/2020 | OHARE MODERNIZATION PROJECT | ($1,056,863.82) | |||
12903390
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/25/2022 | OHARE MODERNIZATION PROJECT | $9,880.00 | |||
12903391
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 02/28/2022 | OHARE MODERNIZATION PROJECT | $89,655.60 | |||
12903392
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/02/2022 | OHARE MODERNIZATION PROJECT | $4,760.00 | |||
12903393
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/08/2022 | OHARE MODERNIZATION PROJECT | $301,467.82 | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/08/2022 | OHARE MODERNIZATION PROJECT | $433,623.17 | ||||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/08/2022 | OHARE MODERNIZATION PROJECT | $3,600,000.00 | ||||
12903396
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/08/2022 | OHARE MODERNIZATION PROJECT | $710,000.00 | |||
OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/10/2022 | OHARE MODERNIZATION PROJECT | $778,901.47 | ||||
12903398
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/14/2022 | OHARE MODERNIZATION PROJECT | ($1,542,625.56) | |||
12903399
| OMP Runway 9R-27L Extension - East, ORD(Spec 1190708) | 03/15/2022 | OHARE MODERNIZATION PROJECT | ($53,193.75) |